Planning and Scheduling Manager working on Venues of the 2012 Olympic Park.
I was responsible for administration of the Programme for the Olympic Stadium and the Aquatics Centre. This included managing the programme for the NEC, reporting performance from the contractors programmes running risk analysis of the programmes and integration with other projects on the Olympic Park.
Performed general accounting, including AR, AP, P&L, consolidations, cash flow, back transactions, inter-company transfers and Budget System development (using Interplan), while taking MBA.
Worked as a Sr. Planning and Cost Engineer for Jaka Property Development and Management Corporation for Splendido Taal Residential Golf and Country Club project, Jaka Tower and Bridgeport Housing Project.
Posted Sat, 2011-10-29 18:29 by Allen Jude Manabat
START Date:
September, 1997
END Date:
December, 2001
Overall in-charge of the PROJECT PLANNING/SCHEDULING & CONTROL of the three(3) simultaneous large scale Airport Core Development projects, "OLYMPIAN CITY 1 & 2" in Tai Kok Tsui, HK, which include:
Posted Sat, 2011-10-29 18:22 by Allen Jude Manabat
START Date:
December, 2001
END Date:
April, 2007
1. JORDAN VALLEY SITE DEVELOPMENT Project in Hong Kong. It compasses a 1 Million cu.m. Rock Blasting/Excavation and built the longest Rock Conveyor, new roads and subway tunnels.
2. KCRC SOUTERN LINK RAILWAY TUNNEL (KDB300 & 200). More than 2 km floating railway tunnel construction using open-cut excavation, massive diaphragm, bored piles, secant walls, temporary sheet pile cofferdams, ground freezing, sophisticated ground investigation and instrumentations. In-charge of the tendering package and the project construction baseline.