TILOS

TILOS, is powerful planning software designed specifically for managing linear projects such as rail, pipelines, roads and tunnels. The system allows you to draw, link and calculate the operations in your project by time and location. The productivity of the process can be imposed and further affected by any hindrances (level crossing, switch, bridge, etc.) that may vary from the norm.

  • Two-dimensional planning based on time and distance (chainage)
  • Combines CAD and project management features
  • Excellent presentation capabilities
  • Resource utilisation charts clearly illustrate requirements
  • Progress updating by when & where
  • Data exchange with P3e v5 & 6 and Microsoft Project
  • Increase the accuracy of your planning to reduce risk and improve project performance.  

Comments

TILOS - Project Management with Time-Location diagram

Some more facts in addition to Andrews summary:

  • TILOS provides all common Projectmanagement-Features in the Time-Location-Diagram:
    On-screen planning and task lists, activity links and constraints, calculating activities (duration, quantity and work rate), CPM Reschedule, Displaying as Time-Location-Diagram, Displaying as Barchart, structured planning (summaries, hammocks, ....), import and export, costs and resource assignment and reporting, reporting and filtering, Progress and Variance analysis
  • Plan the schedule on the same view than the site
    With TILOS you describe your project in a grafical way and you decide by yourself how to display. Including Graphical creation and editing of objects, Layout models (views), Layer techniques (transparencies), WYSIWYG (What You See Is What You Get)
    1132
    tilos_chart2_01.jpg
  • Tools for display of elevation and mass haulage
  • TILOS is distributed worldwide with a big network of partners. See partners webpage.
  • The data exchange allows to exchange schedule data with Microsoft Project, Primavera P6 and Asta Powerproject
  • It can be used for all kind of infrastructural projects, where it is useful to have the location scheduled, like
    Highway-, Railway-, Pipeline- and Tunnel construction, but also in Water Engineering or Transmission Line Building.
  • Look at some Time-Location sample charts
  • More about Project Management with Time Location Diagram in the TILOS website: www.tilos.org

Market Place