Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Soft Landscaping

Soil

Spread topsoil, prepare for turf/seeding = 2.5 m2/hr Spread fertilizer and rake in = 25.0 m2/hr

Planting

Hedges or Shrubs, ne 750 mm high = 4.0 no/hr Hedges or Shrubs, exc 750 m high = 1.5 no/hr Saplings, ne 3.0 m high = 1.7 hrs/no

Turfing

Typical rate including minor preparations = 135 m2/day

Landscaping

Task / DescriptionSlow  Ave  Fast   Units
 Top Soil, spread, level and prepare for turf or seeding-  2.5 -   m2/hr
 Top Soil, rake in fertilizer for seeding-  25.0 -   m2/hr
 Planting, Shrubs and Hedges, under 750mm high-  4.0 -   no/hr
 Planting, Shrubs and Hedges, over 750mm high-  1.5 -   no/hr
 Planting, Saplings, under 3.0m high-  1.7 -   no/hr
 Turfing, including for minor preparations-  16.8 -   m2/hr

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.