%100- Project Planning; Progress Reporting; Primavera P6; Master Schedule; Delay analysis

Associate Director - Delay Analysis, Tudor Rose Consultancy Ltd, Various Projects

START Date: 
September, 2018

Provide independent services/advice to clients, stakeholders, contractors and sub-contractors in the construction industry on all aspects of project delivery/management, project planning, commercial/contracts management, delay analysis and scope change management.

Experience Hours (Planning & Scheduling): 
2000
Experience Hours (Cost Management): 
1000
Experience Hours (Forensic Analysis): 
2000

Sr.Planner & Delay Analyst, Alghanim International General trading & Contracting Co., LFHO Lower Fars Heavy Oil

START Date: 
June, 2016
 Preparation of High level cost estimates. Preparation of Pre Tendering Project Plans, Detailed Progress Reports & Business Case Preparation and Analysis of current status of project using Earned Value ManagementSystem compliant with EIA 748 and NDIA Standards Cost monitoring and Controlling using SAP-PS and FICO Project Schedule Preparation & Checking (level -1 to 4) using Primavera P6 V.16.2 Performing Probabilistic Schedule analysis "What if" and "Monte Carlo Simulation"techniques using Oracle Ri
Experience Hours (Planning & Scheduling): 
1000
Experience Hours (Cost Management): 
400
Experience Hours (Forensic Analysis): 
600

Senior Planning and Scheduling Engineer, Haya Water, 1) Infrastructure 2) Sewerage Treatment Plant 3) Bridge works 4)Building works

START Date: 
August, 2015

Senior Planning and Scheduling Engineer in the Planning and Budgeting department of Project Division of Haya Water. Haya Water is a government owned company acting as the public authority, owner and operator of all Sewage Treatment and Collection related infrastructure in Sultanate of Oman.

My role is to maintain the centralized planning, scheduling, monitoring and reporting functions of all the projects in the company at its HO as a centralized PMO.

Experience Hours (Planning & Scheduling): 
2400
Experience Hours (Cost Management): 
600
Experience Hours (Forensic Analysis): 
600

Senior Planning Officer, Chiyoda Malaysia Sdn Bhd, Petronas Projects, PST Projects

START Date: 
February, 2015
END Date: 
December, 2016

·         Develop Project Master Schedule (PMS).

·         Attend schedule interfacing meeting with Engineering/Procurement/Construction departments from draft up to final PMS.

·         Review subcontractor master schedule and incorporate into the PMS.

Experience Hours (Planning & Scheduling): 
4000

Bid/Project Planning Engineer, Kolin Construction, (Cost & Planning Tasks) Many Hotels - Industrial plants - International airports

START Date: 
March, 2011
END Date: 
May, 2011

Kolin Construction Headquarters

Temporary assignment pending new construction project; worked for the bidding team. Prepared the schedules & methodologies for a bid. Later commissioned to write a program in excel to use in the bidding of the US embassy compounds construction works. Gained experience in bidding works and had the opportunity to learn of the US way of doing project management & bidding (FAR). 

Planning, Project Controls, Head of Capital Project Services, BECHTEL, Liwa Plastics Industries Company(LPIC) EPC1

START Date: 
May, 2011

Planning, PCM, Lead Services for various petrochemical projects at Bechtel Oil Gas & Chemicals (staff position).

Based in Houston Tx. but currently assigned to ORPIC/LPIC PMC role in The Hague Netherlands for the design of a $2.8 billion project which includes a 850 kta liquids feed ethylene cracker plus the utilities and offsites to support both the cracker and the polymers units built by others. 

Planning, Project Controls, Head of Capital Project Services, BECHTEL, Liwa Plastics Industries Company(LPIC) EPC1

START Date: 
May, 2011

Planning, PCM, Lead Services for various petrochemical projects at Bechtel Oil Gas & Chemicals (staff position).

Based in Houston Tx. but currently assigned to ORPIC/LPIC PMC role in The Hague Netherlands for the design of a $2.8 billion project which includes a 850 kta liquids feed ethylene cracker plus the utilities and offsites to support both the cracker and the polymers units built by others. 

Junior Consultant, TBH, Various

START Date: 
September, 2016

Project Controls / Scheduling / Planning & Claims and Dispute Management

Experience Hours (Planning & Scheduling): 
2500

Construction Project Planner / Senior Planner, Al Arif Contracting Company LLC, 3B+G+12+R Residential Building (Jaffiliya), School of research Science (Al Warqa), Union Co operative Society Mall ( Al Barsha)

START Date: 
December, 2012
END Date: 
November, 2014

1. Preparation of Master Baseline Schedule with Resource & Cost Loading

2. Preparation of Recovery & Revised Baseline Schedule as per project requirements

3. Monitoring Site Progress and Recording Delay events (if any) along with necessary contemporary records

4. Preparation of EOT Claim (Interim & Final)

Experience Hours (Planning & Scheduling): 
4000

Senior Project Planner, Hatch Africa, Iron Ore Rail Line & Port Expansion Project

START Date: 
September, 2007
END Date: 
April, 2012
  • This Major Rail Project includes various Civil, Drainage, Concrete Works, Formation Repairs, Vegetation, Overhead Lines / OHTE Electrification, Signalling, Track work, Set Automation, Roads, Bridges, various Workshop Buildings, High Mast Lighting, Road/Rail Shunt Mobiles, Lifting Jacks, Overhead Electrical Travelling Cranes, Fencing, Sewer System, Conveyors, RO Plant, Loco Sanding Plant, Power Upgrade, 50Kv Switching Station, etc.
  • Contracting strategies within the New Engineering Contract (NEC).
Experience Hours (Planning & Scheduling): 
15000
Experience Hours (Cost Management): 
10000
Experience Hours (Forensic Analysis): 
10000