Senior Planner, CNRL, DRU-VDU + H2S

START Date: 
February, 2013
END Date: 
October, 2013

Working with CNRL on Madrid, EPC controller with Primavera 6.2/.7 (P6). Horizon Oil sand refinery. Design of level 3 from level 4, control of both levels. Principal engineering contractor controller, first construction contractor controller.

Experience Hours (Planning & Scheduling): 
1250