Posted Fri, 2013-07-12 10:33 by Nelson Hernandez ...
START Date:
February, 2013
END Date:
October, 2013
Working with CNRL on Madrid, EPC controller with Primavera 6.2/.7 (P6). Horizon Oil sand refinery. Design of level 3 from level 4, control of both levels. Principal engineering contractor controller, first construction contractor controller.