Senior Development Planning Engineer, ConocoPhillips Indonesia, Onshore and Offshore

START Date: 
March, 2012

Responsibilities:

- Prepare and develop schedule, man-power loading and risk assessment of different concepts for the FEL-0 up to FEL-3 activities and work closely with estimator and development engineers.
- Support of Scenario Planning for Field/Block development, identification and delivery of field development milestones and deliverables.
- Facilitating opportunity framing, concept identification, concept selection and others as required for Development Engineering teams and Be an effective focal point for the Development Engineering to

Senior Planning & Project Control Engineer, ConocoPhillips Indonesia, Onshore and Offshore

START Date: 
August, 2011
END Date: 
March, 2012

Responsibilities:

  • Develop planning and scheduling, progress measurement and progress reporting requirements and to incorporate them into the Tenders / Agreements (FEED, EPC)
  • Depth-in review and analysis of all submittals from contractors related to planning, scheduling, progress measurement, reporting, time analysis, project resource loading, critical path, productivity, compliance with work breakdown structure, production of 'what if scenario, individual plan to suit both COPI, BP Migas and Contractors, includes verification of

Planning & Risk Manager, Thales Transport & Security Limited, National Traffic Information Service Transformation Project

START Date: 
July, 2011

Responsible for Project Controls including managing programme, costs and resource on a project to replace the software & hardware in the Highway’s Agency Information Systems control centre, using Agile Programming methodology, using Primavera P6. Also Risk management using Primavera Risk Analyser (Pertmaster).

Project Controls Manager, Linde AG, LNG Projects, Coal Gasification Complex, Ethylene Cracking Complex, FEED

START Date: 
October, 1997
END Date: 
December, 2011

Role:

Project Controls Manager / Senior EPCC Planner for Olefin & Gas Plants

Groupleasder Scheduling & Cost Control

Experience:

14 Years Experience in Project Controls of Petrochemical & Gas Plants 

Full EPCC Proposal & Execution Experience

FEED

Current Experience

Proejct Cotrols Manager of FLNG Proejct (FEED)

Porject Controls Manager of Coal Gasification Project (FEED)

Project Controls Manager, Linde AG, LNG Projects, Coal Gasification Complex, Ethylene Cracking Complex, FEED

START Date: 
October, 1997
END Date: 
December, 2011

Role:

Project Controls Manager / Senior EPCC Planner for Olefin & Gas Plants

Groupleasder Scheduling & Cost Control

Experience:

14 Years Experience in Project Controls of Petrochemical & Gas Plants 

Full EPCC Proposal & Execution Experience

FEED

Current Experience

Proejct Cotrols Manager of FLNG Proejct (FEED)

Porject Controls Manager of Coal Gasification Project (FEED)

Snr. Project Planning Engineer, Kaefer C&D Ltd, Ratcliffe REU & Asbesto's Removal Project

START Date: 
December, 2011

Responsible for the Planning of a Major upgrade at the Ratcliffe Power Station Uk, working as part of the kaefer C&D team to provide the service of: Access, Thermal Insulation, Industrial painting and Cleaning and Civil & Construction Works. I am responsible as Snr. Project Planner to schedule all relevent task and track progress and productivity.

As Part of this I am also the lead Planner of the removal of asbesto's material at Ratcliffe Power Station.

Programme Controls Manager, The Nichols Group, Cooling the Tube Project (TfL / LUL)

START Date: 
September, 2007
END Date: 
December, 2009

Programme Controls Manager

TfL / London Underground Limited (2007 – 2009)

Responsible for the strategic planning for the Cooling the Tube initiative, a complex £912 million programme comprising a large number of innovative design, engineering and environmental projects.  Led constructive challenge to key project information, which was important to enable assurance to the Project Director and Sponsors within project investment and governance arrangements.  Specific activities undertaken include:

Proposals/Planning Engineer, NSG Environmental Ltd, AWE, Magnox Ltd, Multiple projects for employers including: Sellafield Ltd

START Date: 
January, 2011

Planning

Production of project plans in Primavera P6; Initial cost planning including resource and duration, in support of tender submissions.

Production of project plans for project execution and updating existing plans to reflect current project status

Created project plans up to £1.2m over 5 years.

Adapting active programs to ensure key milestones and client KPI’s are achieved.

Scheduling and maintaining programmes for a significant project that is a major contributor to the annual business turnover.

Cost <

Construction Analyst/Project Scheduler, ecoseed, 1.Construction of Multistoried Buildings

START Date: 
December, 2008

a  p6 trainer  at  " AMIES it  academy   & cellection academy  and   MYACADEMY " for management 
 feasibility studies trainer  at MY academy 
 planning  instructor at my academy 
risk management  instructor   at My academy 