Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Alok Kumar

First Name: 
Alok
Last Name: 
Kumar

ALOK KUMAR

Phone:(M) + 971558028596  Email: ar_alok_kr@yahoo.co.in

 

 

Sr. Planning Engineer with more than 11 Years of Experience

 

Result-driven professional with more than11 years of experience in the field of Urban Infrastructure (Fuel-Petrol/Diesel/NGV filling and Service station, Airport, Metro Rail, Hospital, Stadium, School, Housing), Villas Construction and Real Estate industries;

F  In depth understanding of modern methodologies & best engineering practices across discipline such as Civil Works, Interiors & Fit out, MEP, BMS, Instrumentation & Tele-communication.  

Clear understanding of Integration, Scope / time, cost, quality, safety & Procurement Management of the Projects.  Proficient in developing Baseline Program (Development of WBS, Activity Coding System, Resource Loading, Cost Loading) Analysis and Planning Reports, Claims, etc.

 

CORE COMPETENCIES

 

 

üBaseline Program

üProject Planning, Monitoring and Control

üPrimavera P3, P6.2, P6.7, P6.8

üExtension of Time (EOT)

üFIDIC condition of contract

üPlanning Techniques

üProject Management

üClient Relationship

üRoot Cause Analysis Techniques

 

 

PROJECTS COMPLETED

 

Ø  Metro Rail Project-                    Delhi Metro rail (Airport metro rail express Link ),

Ø  Airport Project–                         a) Abu Dhabi International Airport (MTB) (Current Project)

b)Delhi International Airport, Terminal 3, ASB Building.

Ø  Hospital Project –                      a) Cleveland Clinic @ Sowwah Island – Abu Dhabi (364 Beds Hospital)

b) BYLC Eye Hospital, Jharkhand, India

Ø  Stadium Project-                        Al Ain Stadium, Al Ain (Fast Track Project)

Ø  School Project –                          Jindal School at Sui(Haryana), India

Ø  Service Station          -               ADNOC service Stations (UAE)  

Ø  Housing Project Includes –    a) Housing Project spread in 126 Acres with More than 500 Premium Villas and High Rise Buildings at Eco Vale, Hyderabad.

 

EDUCATIONAL QUALIFICATIONS

 

ü  Post Graduate Diploma in Construction Management from National Institute of Construction Management and Research (NICMAR, Pune).

ü  Bachelor in Architecture from NIT, Patna (India).

 

SOFTWARE SKILLS

 

 

ü  Microsoft Project

ü  MS Word

ü  MS Excel

ü  MS Power Point

ü  Primavera P6

ü  Navisworks

ü  Primavera P3

ü  Auto CAD

 

 

PROFESSIONAL EXPERIENCE

 

A)     M/S ALTORATH INTERNATIONAL ENGINEERING CONSULTANTS, UAE  -  7 Months

Role:                                              Sr. Planner, PMC

Reporting to:                               Team Leader

Project Handling:                     a) ADNOC Service Station Construction Projects

Client:                                           ADNOC Distribution

Consultant:                                 ALTORATH INTERNATIONAL ENGINEERING CONSULTANT, UAE

Project Value:                              Varies For Different Projects

 

Key Responsibilities:

ü  Review, analyse and approve Baseline Program/ Recovery Program/ Commissioning programand to ensure plan is achievable, includes all critical Activities, Authority Approvals etc.

ü  Apply Principles of Planning, Priority of works, Budgeting, Material Logistics, and resource management to ensure smooth running of Project and completion of Project on time and within budget.

ü  Review and approve Engineering and Procurement schedule submitted by Contractor and make sure schedule is in line with the BL Program.

ü  Time  Cost and Resource analysis (based on both forward pass and backward pass)for Base line and Updated Programs

ü  Review Daily, Weekly and monthly report submitted by contractor and highlight any deviation or non compliance.

ü  Review the Project progress in detail and verify the Contractor’s Payment Application and track any variation (Schedule or cost). In case of delay or variation recording the delay and notifying to all concerned parties.

ü  Progress Monitoring, Analyzing  and Computing Variances and prepare KPI’s, histograms, S-curves and other analyses

ü  Regularly visiting the site and attending progress meetings. Ensuring work progress is as per BL schedule and In case of slippage or anticipated slippage or variation highlighting to Construction manger/ Project Manager.

ü  Review, analyse and prepare report for Time Impact or/ and Extension of Time (EOT) Claim.

ü  Assist Project Manager/ Construction manager in Project Management work

ü  Prepare and maintain project correspondences related to planning function and actively participating and providing planning input.

 

B)      M/S AL GHURAIR CONSTRUCTION, UAE -  1 Year 5 Months

Role:                                              Lead Planner (Projects) 

Reporting to:                               Project Director

Project Handling:                     a) Abu Dhabi International Airport Project (Mid Field Terminal

Building), Abu Dhabi

Client:                                           Abu Dhabi Airports Company (ADAC)

Consultant:                                 AECOM

Project Value:                              10.8 Billion AED

 

Key Responsibilities:

ü  Preparation of Baseline Program

ü  Preparation of Recovery Program

ü  Preparation of Construction Program

ü  Preparation and Tracking of Engineering and Procurement and Production Plan for the Project

ü  Prepare KPI’s, histograms, S-curves and other analyses

ü  Progress Monitoring, Updating, Analysis  and Computing Variances

ü  Preparation of Extension of Time (EOT)

ü  Preparation of Budget and Cash flow for the projects,

ü  Preparation of Reports and Projections (Cost, Manpower, Progress of Work, Major Billing Areas, Major Equipment Installation, etc.)

ü  Assist in the MIS generation 

ü  Daily, Weekly and Monthly Reports

ü  Preparation of Organization Chart and Presentations.

ü  Co-ordinate and manage Client planning requirement, Site planning requirement and Top management planning requirements.

ü  Managing Client’s Requirements and Internal Planning requirements.

 

C)      M/S ETA ASCON GROUP, Abu Dhabi, UAE(Apr’10 – Feb 14) -  3 Years 11 Months

Position                                        Asst. Planning Manager               

Projects Handled:                    

 

a)       Project :                                Al Ain Stadium & Mixed Use development, Al Ain(Fast Track Project), UAE,

Seating Capacity – 25,000

Reporting to:                       Project Director

Client:                                   AAFAQ Holding

Consultant:                         EC Harris

Project Value:                      3.5 Billion AED

 

b)      Project:                                 Cleveland Clinic, Abu Dhabi (Multispecialty Hospital- 364 Beds expandable

up to 490 Beds (Five Star Facility Hospital Project – One of the largest

Medical Centre in Middle East)

Reporting to:                       Project Director

Client:                                   MUBADLA Development

Consultant:                         JACOBS

Project Value:                      5.65 Billion AED

 

D)     M/S TCON ENGINEERS (Jan’09 – Apr’ 10)- 1 Year 4 Months

Position                                        Planning and Coordination Manager (reporting to Director Projects)          

Projects Handled:    

a)       Project :                                IGI Airport Terminal 3, International Airport Delhi (India) (8th Largest

Passenger Terminal)

Reporting to:                       Project Director

Client:                                   DIAL

Consultant:                         Parsons Brinckerhoff International

Project Value:                      54 Billion INR

b)      Project:                                 Delhi Airport Metro Rail Link Project (Metro Rail Project)

Reporting to:                       Project Director

Client:                                   DAMEL

Consultant:                         MTR Corp

Project Value:                      57 Billion INR

 

E)      M/S KUMAR BUILDERS, INDIA (Jan’08 – Dec’08)- 1 Year

Position                                                Project Planner and Coordinator (reporting to Director Projects.)

Projects Handled:           

               

a)       Project :                                Kumar EcoVale, Hyderabad (India), (Integrated Housing Project- Spread

Over More than 216 Acres)

Reporting to:                       Director Projects

Client:                                   Kumar Builders

Consultant:                         SURBANA International

Architect:                             IESCO (Italy) and M&M (India)

Project Value:                      5.26 Billion INR

 

F)       UNIARCH, India (Aug 03 – Jul’ 06)- 3 Years (Including Training)

Asst. Architect (reporting to Sr. Architect/ Project Manager)

 

Projects Handled:

F  During my stay, worked on more than 22 small and Medium Projects it includes Residential Buildings(High rise and low rise), Jindal School at  Sui Villege, Haryana, India

F  Designed and Supervised the construction Work Jindal School at (Haryana) India,

F  Designed and Supervised the construction Work of Residential building for  Mr. Mittal at Delhi and other Projects.

 

Key Deliverables:

ü  Design Conceptualization

ü  Preparation of Working Drawing and submission drawing,

ü  Preparation of BOQ and specifications.

ü  Preparation of Presentation for the Project

ü  Preparation of Shop Drawings.

ü  Prepared Elementary Cost Breakdown Structure.

ü  Liaisoning Work

ü  Site work Supervision

ü  Coordination between architectural team , client & contractor

ü  Transforming Market Survey Data to design Requirements

 

TRAININGS & SEMINARS

 

ü  Attended Training for Auto CAD

ü  Attended Training for Primavera (P3, P5 & P6)

ü  Attended Training for MS Project

ü  Attended Training for Navisworks

ü  Member of PMI

ü  Registered with COA, India

ü  Training programs related to safety at site.

ü  Participated in workshop on “Consultancy Management Skills” organized by The Institute of Management Consultant of India Pune Chapter.

ü  Presented Paper on Design for physically challenged People.

ü  Attended Seminar on Earth Quake resistant building

ü  Participated in 10 days Vipashna workshop

ü  Participated in 2 Days Health Improvement and Stress Management Camp.

 

 PERSONAL PROFILE

 

 
Date of Birth                                     :                   19th May 1978
Languages Known                        :                   English, Hindi

Passport Number                          :                  J6999487

References                                       :                   Available on Request

 

 

 

 

 

(ALOK KUMAR)              

Professional Since: 
Jul-2003 (21.1 yrs experience)
Oldest experience: 
Jul 2003 (21.1 yrs experience)
Years Experience: 
0

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.