1-Organization:Jacobs Zate, Al-Khobar, Saudi Arabia (July 2015 to date)

Client: SAUDI ARAMCO - General Engineering Services Contract

Designation: Project Engineer 

 

Projects:

A - BI-10-00778Replacement of 3 Substations at Riyadh Refinery

B - BI-10-01522  Replace Pressure Vessels – South Ghawar

 

2-Organization:Fluor Arabia Limited, Al-Khobar, Saudi Arabia (November 2011 to date)

A- Designation: Project Engineer Mechanical    

Project: S-Chem– General Engineering ServicesReimbursableContract

Client: SAUDI CHEVRON

 

B- Designation: Project Engineer    

Project: SAMAPCO (BI-21-00047) - Lump Sum Contract

Client: A joint venture of SAHARA & MA’ADEN PETROCHEMICALS COMPANY

 

C- Designation: Project Engineer    

Project: KNPC Clean Fuels Project - $3.4 billion (TIC) Lump Sum Turnkey Contract

Client: Kuwait National Petroleum Company

D- Designation: Project Engineer    

Project: BHSA Jubail Chemical Manufacturing Plant - $2.5 MM Lump Sum FEED Contract

Client: Baker Hughes

E- Designation: Project Engineer    

Project: Luberef PDA Revamp Project, Yanbu- $8.0 million Lump Sum Detailed Engineering and Design Contract

Client: Luberef- A joint venture of SAUDI ARAMCO & EXON MOBIL

F- Designation:Project Engineer – Port and Buildings  

Project: SADARA – $ 800 MM Cost Reimbursable EPC Contract

Client: SAUDI ARAMCO & DOW Chemical Company

Responsibilities:

·         Responsible for extended construction phase planning of Sadara Port 42 chemical storage tanks (CS and SS) and one 25m dia Butene sphere. Eight of these tanks have a concrete outer double containment wall.

·         Developed construction operation plan in conjunction with the Project Engineering & Scheduling team.

·         Involved in planning construction duration, construction methodology & thoughts on grouping foundation and walls with the tank design and construction for Port Tank Farm & SASREF HFO Facilities.

·         Supported FEED construction planning

·         Prepared milestone schedules during the conceptual phase, construction management & planning with constructability sessions and pre-construction conferences during detail engineering. 

·         Analyzed project design drawings and plans to determine what construction problems are involved.

·         Met with contractor job supervisors, assigned construction engineers, and any others involved in the project, to define and discuss the construction plan.

·         Analyzed construction schedule and sequence to ensure that all forecasted manpower and equipment availability limitations have been recognized, considered and overcome.

·         Close monitoring of the project to observe work progress, investigating any evidence of substandard job performance, deviations from construction schedules, initiating and following up any corrective action.

·         Coordinated activities to allow construction activities to progress according to plan mechanical completion.

·         Developed and coordinated the preparation of invitation to bid package and strategy for solicitation, technical information and preparation of tender and contract documents for construction.

·         Development of constructability and construction execution plan for KNPC Clean Fuels Project

·         Reviewed the requirements for the eligibility of the bidders. 

·         Evaluated and analyzed, and recommended bidders in regards to tenders.

Trainings / Courses:

·         Fluor Construction Engineering Essentials

·         Fluor Project Management Essentials

·         Project Execution Team Roles and Responsibilities

·         Baseline Centric Execution

·         Change Management

·         The Essentials of Client Service Excellence

·         Risk Management Process

·         Materials Planning and Control– Engineering Responsibilities

·         Assessing and Managing Risk

·         Cost Competitive Engineering

·         Writing Project Scopes

 

3-Organization:Byco Petroleum Pakistan Limited, (March 2010 to November 2011)                                     

A- Designation:Project Engineer / Project Leader (Projects – Technical Division)  

Project: Byco Oils Pakistan Limited (BOPL)

Project Cost:$800MM

a)     Construction of 6 Nos. Utility Tanks 12m ø x 14.63 m ht, one Fire Water Tank 45m ø x 14.63 m ht tank

and 3 Nos. 27 m ø x 14.63 m ht. Furnace Oil storage tanks & associated piping works.

b)     Construction of 9 Nos. LPG Vessels ø 4.5 m x 27m (tangent to tangent length).

 B- Designation: Project Engineer /Site Incharge (Projects – Technical Division)  

Project: Byco Chemicals Pakistan Limited (BCPL),Construction work on the 9 Nos. (27 m ø x 14.63 m ht.) new product storage tanks for Raffinate, C-9, Benzene, Mixed Xylene, Para Xylene & Ortho Xylene.

Project Cost:$600MM      

Responsibilities:            

·         Responsible for construction activities planning, monitoring and coordination / liaison with contractor.

·         Management of engineering, construction activities and project coordination services as per project drawings, specifications and scope of work for mechanical works.

·         Monitored and analyzed the project progress, developed statistical reports and highlighted lack of progress according to plan and target schedule.

·         Organized internal meetings to address and expedite the issues of progress and material procurement.

·         Assessed the impacts of design/ construction changes and schedule slippages.

·         Verified work progress and Contractor’s invoices.

·         Compiled punch list before hydro testing of tanks and commissioning.

 

4-Organization:ZEL (Zishan Engineers Ltd.) (January 2006 to Feb 2010)

A- Designation:Project Engineer / Site Engineer (Mechanical)  

Project: National Refinery Ltd., Karachi- Construction of one 140 ft. ø x 48 ft height external floating roof

             tank & construction of fixed roof storage tanks, 6 Nos. 60 ft ø. x 42 ftht. HSD, JP-1, Asphalt and 

             LBO storage tanks;  2 Nos. 70 ft ø. x 48ft ht. Furnace Oil storage tanks and associated piping works

Project Cost:$3MM

Responsibilities:

·         Engineering management & project coordination services as per project specifications & scope of work.

·         Site supervision of construction works for compliance with drawings and specifications.

·         Responsible for activities planning, monitoring and coordination / liaison with client.

·         Prepared weekly & monthly reports regarding planning and progress.

·         Organized internal meetings to address and expedite the issues of drawings and material procurement.

·         Verified work progress and contractor’s invoices.

·         Compiled punch list before hydro testing of tanks and commissioning.

·         Mechanical seals, pantographs and accessories installation as per specifications & vendor’s instructions.

·         Installed Impressed Current Cathodic Protection (ICCP) system for all tanks.

·         Tie-ins with existing lines.

·         LBO Tanks Suction Heaters  and Fire Water & Foam System installation for tanks.

·         Heating coils & insulation works for Asphalt & Furnace Oil tanks.

 

B- Designation:  Project Engineer (Mechanical / Costing) 

Project:Makwind Energy Pvt. Ltd 50MW Wind Farm near Nooriabad, Sindh, Pakistan. The farm was estimated to generate 153GW of electricity per year.

Project Cost:$120MM

Responsibilities:

·         Developed financial model and feasibility report of the Makwind Energy.

·         Calculated tariff, studied site selection, analyzed wind data and micro-siting of wind farm.

·         Determined energy yield of farm.

                

C- Designation:Project Planning/ Scheduling & Invoicing Engineer  

Project:IFFCO Edible Oil Refinery Expansion Project at Port Qasim Karachi.

The expansion Included New 200TPD Edible Oil Refinery, Margarine Producing Unit, Hydrogen Generation Unit & Packaging of the Products

Project Cost:$23MM          

 Responsibilities:

·         Evaluated the planning and scheduling information collected from engineering, procurement and construction department and subcontractors.

·         Monitored & analyzed the progress & highlighted lack of progress according to plan & target schedule.

·         Controlled project for keeping the project on-track, on-time and within budget.

·         Prepared weekly and monthly reports regarding planning and document controlling.

·         Developed billing methodology and prepared invoices for payments.

 

D - Designation:Project Planning/ Scheduling Engineer  

Project: Fatima Fertilizers Company Ltd. Expansion Project at Sadiqabad, Punjab, Pakistan

Project Cost:$2MM

 

5- Organization: Karachi Shipyard & Engineering Works Ltd. (KSEW) (Jun 2002 – May 2005)

Position: Worked asTrainee Engineer in Heavy and Light Steel fabrication and Welding shops.

Professional Since: 
Jun-2002 (22.5 yrs experience)
Years Experience: 
0

Market Place

No results found... (try selecting a different content filter)