I need some information on a Water Pipeline Project

No replies
farooque jawaid
User offline. Last seen 5 years 12 weeks ago. Offline
Joined: 11 Dec 2010
Posts: 4

Hi 

A Very Very Happy New Year to members of Planning Planet.

I am a young professional in Planning & have never work before either on site or on a Planning & Scheduling. My goal is to become a successful planner & I got opportunity in my current organization now. I am looking some guidance on this issue.

If any one has complete library of Manpower & machinery calculation please guide me on md.farooque@gmail.com

My project is not a big one but the items are included as follows.

1-Road Diversion

2-Relocation of existing Utilities

3-Excavation & formation preparation

4-Bedding of Material & Laying of Pipe

5-Welding of Pipe in Trench

6-Construction of Thrust Block

7-Initial Back Filling

8-Testing

9-Sterilization and cleaning

10-Final Back Filling

11-Restoration of Asphalt

Construction of Valve Chambers

1-Setting out

2-Excavation for Manhole

3-Blinding

4-Construction of Base

5-Construction of Wall

6-Installation of Fittings & Valve

7-Test

8-Cover Slab

I never worked on any pipeline project before, only worked on Railway & Highway project in Drawing & Quantity section. This project is in Saudi Arabia. I am on a junior level so I don't have information related to soil, or any other issue which may required to planning,

If you have specification of pipe line project & any design book for design of valve chamber please share with me.

Here I need manpower & machinery calculation, how much gap should be gap between each activity. I know MSP & P6 but not expert.

You can guide me on md.farooque@gmail.com

Farooque