Resource Usage Profile

K
Kannan CP 👤 Member for 18 years

Hi,

I developed one programme with labour units input (resource). While preparing the resource distribution month wise, it was working smoothly from Toools- Report Wizard. But not working properly with Resource spread sheet.

Problem in detail:

1. From Tools- Report wizard, I ticked the box for average and put the value as 30(to divide) to get a monthwise average

2. When I tried the same using the Resource Using profile and put the value as 30 its still showing the cumulative only.

For eg: 30 man days in a month. as average 1 person (Tools-Report wizard calculation)

same showing as 30 with repource profile  (even with the average box ticked and value as 30)

Any ideas what may be wrong. I presume some tick box missing.

Regards

Kannan

 

 

Forum Sponsor

Top Posters

Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts
James Williams
74 posts
Haque Nawaz
10 posts