Website Upgrade Incoming - we're working on a new look (and speed!) standby while we finalise the project

Tips on using this forum..

(1) Explain your problem, don't simply post "This isn't working". What were you doing when you faced the problem? What have you tried to resolve - did you look for a solution using "Search" ? Has it happened just once or several times?

(2) It's also good to get feedback when a solution is found, return to the original post to explain how it was resolved so that more people can also use the results.

REFERENCE PLANNING FOR EPC PIPELINE PROJECTS

5 replies [Last post]
SANJEEV KOUL
User offline. Last seen 16 years 49 weeks ago. Offline
Joined: 1 Mar 2007
Posts: 18
I have been assigned to prepare a masterplan for EPC pipeline project , starting from feasibility study , engineering , formation and award of EPC contracts,procurement,constructioin/installation , testing and commisioning of pipeline.
I am in need of a sample pipeline project schedule (ie P3 schedule) detailing list of activities (civil,mechanical,piping,instrumentation,electrical etc), durations of activities ,critical activities etc.I need support till i complete this schedule on P3 espacially as i have very limited and basic knowledge only about Primavera.
I shall highly appreciate any aupport in this connection.

Replies

SANJEEV KOUL
User offline. Last seen 16 years 49 weeks ago. Offline
Joined: 1 Mar 2007
Posts: 18
Dear Mr Liu ;

Thanks for the valuable information.This is eactly what i wanted and it shall surely be very helpful to me to start with.

Regards

Sanjeev Koul
Jesse Liu
User offline. Last seen 13 years 37 weeks ago. Offline
Joined: 24 Feb 2007
Posts: 3
I hope this can help. It’s includes all the WBS & activities of my previous project. The critical activities is calculated by P3. I can’t do everything for you or next time you will ask me to wipe you ass!
WBS Linked Activities
WBS Code WBS Name
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Corporation
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX-Branch
OIL Oil Projects
Unkown Project Unkown Project Name
PS#6 Pump Station No. 6 Change Orders No.1-No.4
GASSAB FSF GASSAB FSF Project
4 Buildings 4 Buildings
NFPF GREATER NEEM FPF PROJECT
NFPF.01 PROJECT MAJOR MILESTONES
M110 Contract Effective Date
M120 Site Mobilization Completion Date
M130 Mechanical Completion Date
M140 Provisional Acceptance Date
NFPF.02 ENGINEERING
NFPF.02.01 FPF
NFPF.02.01.01 General
E11010 Site visit, data collection & S/V report
E11020 Design basis mamorandum
E11030 PFDs and P&IDs
E11040 Process simulation/calculations
E11050 SLD’s & motor feeder schematics
E11060 Overall I&C system block diagram
E11070 Plot plan & key plans
E11080 Simulation / material balance report
E11090 O&C philosophy
E11100 Finalization of key deliverables
E11170 Major engineering completed
NFPF.02.01.02 Process
E11110 Optimisation studies
E11120 Equipment list / line list
E11130 HAZOP
E11140 HAZOP reports & close-outs
E11150 Miscellaneous process drawings
E11160 Pre-com./commissioning manuals
NFPF.02.01.03 Piping
NFPF.02.01.03.01 Engineering
E13130 Data sheets & specifications
E13140 Equipment layouts & piping GA’s
E13150 Stress analysis, Iso’s & Std drawings
E13160 Misc.piping drawings/details
E13170 Bulk MTO’s
NFPF.02.01.03.02 Procurement Service
E13010 MR PIP001 for Valves
E13020 MR PIP003 for U/G Pipes & Fittings
E13030 MR PIP004 for Insulation
E13040 MR PIP005A for Flexible Hoses
E13050 MR PIP005B for Access Fittings
E13060 MR PIP005C for Basket Strainer
E13070 MR PIP005D for Y Type Strainer
E13080 MR PIP005E for Flame Arrestor
E13090 MR PIP005F for Expansion Bellow
E13100 MR PIP006 for A/G Pipes and Fittings
E13110 MR PIP008 for Painting
E13120 MR PIP009 for Fire Fighting Equipment
E13180 Technical bid evaluation
NFPF.02.01.04 Mechanical
NFPF.02.01.04.01 Engineering
E14240 Mechanical spec. & data sheets
E14250 Tanks fabrication drawings
E14260 Misc. mechanical drawings / details
NFPF.02.01.04.02 Procurement Service
E14010 MR-001 for FWKO
E14020 MR-002 for Test Separator
E14030 MR-003 for Heater Treaters
E14040 MR-004 for CPI Separator
E14050 MR-005 for Gas Boot
E14060 MR-006 for Diesel Fuel Coalescing Separtor Filt.
E14070 MR-007 for Flare Stack
E14080 MR-008 for Portable Water Treatment Package
E14090 MR-009 for Flare KO Drum
E14100 MR-010 for Floating Oil Skimmer
E14110 M011 for Fuel Gas Scrubber
E14120 M012 for Chemical Injection Skid
E14130 M013 for Closed Drain Sump Skid
E14140 M014 for Instrument Air Package
E14150 M015 for Nitrogen Generation Package
E14160 M016 for Heat Exchangers
E14170 M017 for Centrifugal Pumps
E14180 M018 for Screw Pumps
E14190 MR for Progressive Cavity Pumps
E14200 MR for Fire Extinguishers
E14210 MR for Gear Pumps
E14220 MR-025 for API Tank Material
E14230 MR-026 for API Tank Accessories
E14270 Technical bid evaluation
NFPF.02.01.05 Electrical
NFPF.02.01.05.01 Engineering
E15140 Specifications & data sheets
E15150 Load list, SLD’s & calculations
E15160 Electrical layouts, schedules, HACs
E15170 Std installation Dtls & interconnection
E15180 Misc. electrical drawings / details
E15190 Electrical bulk MTO
NFPF.02.01.05.02 Procurement Service
E15010 MR-001 for 6.6KV Switchgear
E15020 MR-002 for 33KV Switchgear at Substation
E15030 MR-003 for Power Transformers
E15040 MR-004 for 400V Switchgear/Busducts
E15050 MR-005 for Diesel Generator Set
E15060 MR-006 for Electric Heaters
E15070 MR-007 for AC UPS System
E15080 MR-008 for DC UPS System
E15090 MR-009 for Lighting Poles & Junction Boxes
E15100 MR-010 for Cables,Glands & Termination Kits
E15110 MR-011 for Cable Trays and Accessories
E15120 MR-012 for Electrical Bulks
E15130 MR-013 for Electric Heat Tracing
E15200 Technical bid evaluation
NFPF.02.01.06 Cathodic Protection
NFPF.02.01.06.01 Engineering
E16040 CP specs & calculations
E16050 CP design deliverables
E16060 Misc. CP drawings/details
E16070 CP preliminary MTO
NFPF.02.01.06.02 Procurement Service
E16010 MR for CP Materials under Tank Bottom
E16020 MR for CP Material for Pilings
E16030 MR for Aluminum Alloy Sacrifial Anode
E16080 Technical bid evaluation
NFPF.02.01.07 Instrumentation & Control
NFPF.02.01.07.01 Engineering
E17160 Instrument specs & data sheets
E17170 Control system Arch.,control & logic
E17180 Inst.index,schedules,C&E Dgm
E17190 Control room layout & instrument
E17200 F&G system drawings
E17210 Loop /hook-up / interconnection
E17220 Misc.instrument drawings/details
E17230 Instrument bulk MTO
NFPF.02.01.07.02 Procurement Service
E17010 MR J001 for ESDV
E17020 MR J002 for CV & PCV
E17030 MR J003 for PSV & PVRV
E17040 MR J004 for Electronic Transmitters
E17050 MR J005 for Level Transmitters
E17060 MR J006 for Flow Meter
E17070 MR J007 for Gauges
E17080 MR J008 for FE (Orifice Plates) & RO
E17090 MR J009 for Product Allocation Metering Skid
E17100 MR J010 for Control / Safety System
E17110 MR J011 for Fire & Gas Detection Devices
E17120 MR J012 for Building Fire Alarm System
E17130 MR J013 for Instrument Cables & Glands
E17140 MR J014 for Instrument Junction Boxes
E17150 MR J015 for Instrument Bulks
E17240 Technical bid evaluation
NFPF.02.01.08 Civil
NFPF.02.01.08.01 Engineering
E18080 Topographical/geotechnical survey spec
E18090 Civil/structural general notes,typical dwg.
E18100 Typical tank pad details
E18110 Rough grading plans,pile key plan
E18120 Final grading,pile lyt,skid/misc.
E18130 Structural steel/pipe rack/support
E18140 Misc.civil drawings/details
NFPF.02.01.08.02 Procurement Service
E18010 MR for Piling material
E18020 MR for Structual Steel
E18030 MR for Fencing material
E18040 MR for Building material
E18050 MR for Concrete material
E18060 MR for Civil specialty items
E18070 MR for Culverts material
NFPF.02.02 33KV Substation
NFPF.02.02.01 Electrical
E18150 Data sheet
E18160 Feeder list & single line diagram
E18170 Electrical layouts
E18180 Haz.area classification / safety data
E18190 Misc. electrical drawings / details
NFPF.02.02.02 Cathodic Protection
E18200 CP design deliverables
NFPF.02.02.03 Instrumentation & Control
E18210 Instrumen cable block diagram
E18220 Instrument interconnection drawing
E18230 Miscellaneous drawings/documents
NFPF.02.02.04 Civil
E18240 Spec. for top/geotech survey
E18250 Fence layouts & gate details
E18260 Rough grading plan & piling key plan
E18270 Design calculations
E18280 Final grading plans & pile layouts
E18290 Civil / structural layouts & details
E18300 Misc.civil drawings / details
NFPF.03 PROCUREMENT
NFPF.03.01 Mechanical
NFPF.03.01.01 Free Water Knock Out Drum(M-001)
P10010 Issue of inquires
P10020 Issue of purchase order
P10030 Delivery Ex-Works
P10040 Transportation to Sudan
P10050 Custom Clearance
P10060 Delivery job site
P10070 Required on Site (ROS) date
NFPF.03.01.02 Test Separator(M-002)
P10090 Issue of inquires
P10100 Issue of purchase order
P10110 Delivery Ex-Works
P10120 Transportation to Sudan
P10130 Custom Clearance
P10140 Delivery job site
P10150 Required on Site (ROS) date
NFPF.03.01.03 Heater Treater (M-003)
P10170 Issue of inquires
P10180 Issue of purchase order
P10190 Delivery Ex-Works
P10200 Transportation to Sudan
P10210 Custom Clearance
P10220 Delivery job site
P10230 Required on Site (ROS) date
NFPF.03.01.04 CPI Separator(M-004)
P10250 Issue of inquires
P10260 Issue of purchase order
P10270 Delivery Ex-Works
P10280 Transportation to Sudan
P10290 Custom Clearance
P10300 Delivery job site
P10310 Required on Site (ROS) date
NFPF.03.01.05 Gas Boot(M-005)
P10330 Issue of inquires
P10340 Issue of purchase order
P10350 Delivery Ex-Works
P10360 Transportation to Sudan
P10370 Custom Clearance
P10380 Delivery job site
P10390 Required on Site (ROS) date
NFPF.03.01.06 Diesel Fuel Coalescing Separator Filter(M-006)
P10410 Issue of inquires
P10420 Issue of purchase order
P10430 Delivery Ex-Works
P10440 Transportation to Sudan
P10450 Custom Clearance
P10460 Delivery job site
P10470 Required on Site (ROS) date
NFPF.03.01.07 Flare Stack(M-007)
P10490 Issue of inquires
P10500 Issue of purchase order
P10510 Delivery Ex-Works
P10520 Transportation to Sudan
P10530 Custom Clearance
P10540 Delivery job site
P10550 Required on Site (ROS) date
NFPF.03.01.08 Portable Water Treatment Package(M-008)
P10570 Issue of inquires
P10580 Issue of purchase order
P10590 Delivery Ex-Works
P10600 Transportation to Sudan
P10610 Custom Clearance
P10620 Delivery job site
P10630 Required on Site (ROS) date
NFPF.03.01.09 Flare KO Drum(M-009)
P10650 Issue of inquires
P10660 Issue of purchase order
P10670 Delivery Ex-Works
P10680 Transportation to Sudan
P10690 Custom Clearance
P10700 Delivery job site
P10710 Required on Site (ROS) date
NFPF.03.01.10 Floating Oil Skimmer(M-010)
P10730 Issue of inquires
P10740 Issue of purchase order
P10750 Delivery Ex-Works
P10760 Transportation to Sudan
P10770 Custom Clearance
P10780 Delivery job site
P10790 Required on Site (ROS) date
NFPF.03.01.11 Fuel Gas Scrubber(M-011)
P10810 Issue of inquires
P10820 Issue of purchase order
P10830 Delivery Ex-Works
P10840 Transportation to Sudan
P10850 Custom Clearance
P10860 Delivery job site
P10870 Required on Site (ROS) date
NFPF.03.01.12 Chemical Injection Skid(M-012)
P10890 Issue of inquires
P10900 Issue of purchase order
P10910 Delivery Ex-Works
P10920 Transportation to Sudan
P10930 Custom Clearance
P10940 Delivery job site
P10950 Required on Site (ROS) date
NFPF.03.01.13 Closded Drain Sump Skid(M-013)
P10970 Issue of inquires
P10980 Issue of purchase order
P10990 Delivery Ex-Works
P11000 Transportation to Sudan
P11010 Custom Clearance
P11020 Delivery job site
P11030 Required on Site (ROS) date
NFPF.03.01.14 Instrument Air Package(M-014)
P11050 Issue of inquires
P11060 Issue of purchase order
P11070 Delivery Ex-Works
P11080 Transportation to Sudan
P11090 Custom Clearance
P11100 Delivery job site
P11110 Required on Site (ROS) date
NFPF.03.01.15 Nitrogen Generation Package(M-015)
P11130 Issue of inquires
P11140 Issue of purchase order
P11150 Delivery Ex-Works
P11160 Transportation to Sudan
P11170 Custom Clearance
P11180 Delivery job site
P11190 Required on Site (ROS) date
NFPF.03.01.16 Heat Exchangers(M-016)
P11210 Issue of inquires
P11220 Issue of purchase order
P11230 Delivery Ex-Works
P11240 Transportation to Sudan
P11250 Custom Clearance
P11260 Delivery job site
P11270 Required on Site (ROS) date
NFPF.03.01.17 Centrifugal Pumps(M-017)
P11290 Issue of inquires
P11300 Issue of purchase order
P11310 Delivery Ex-Works
P11320 Transportation to Sudan
P11330 Custom Clearance
P11340 Delivery job site
P11350 Required on Site (ROS) date
NFPF.03.01.18 Screw Pumps(M-018)
P11370 Issue of inquires
P11380 Issue of purchase order
P11390 Delivery Ex-Works
P11400 Transportation to Sudan
P11410 Custom Clearance
P11420 Delivery job site
P11430 Required on Site (ROS) date
NFPF.03.01.19 Progressive Cavity Pumps
P11450 Issue of inquires
P11460 Issue of purchase order
P11470 Delivery Ex-Works
P11480 Transportation to Sudan
P11490 Custom Clearance
P11500 Delivery job site
P11510 Required on Site (ROS) date
NFPF.03.01.20 Fire Extinguishers
P11530 Issue of inquires
P11540 Issue of purchase order
P11550 Delivery Ex-Works
P11560 Transportation to Sudan
P11570 Custom Clearance
P11580 Delivery job site
P11590 Required on Site (ROS) date
NFPF.03.01.21 Gear Pumps(M-023)
P11610 Issue of inquires
P11620 Issue of purchase order
P11630 Delivery Ex-Works
P11640 Transportation to Sudan
P11650 Custom Clearance
P11660 Delivery job site
P11670 Required on Site (ROS) date
NFPF.03.01.22 API Tank Materials(M-025)
P11690 Issue of inquires
P11700 Issue of purchase order
P11710 Delivery Ex-Works
P11720 Transportation to Sudan
P11730 Custom Clearance
P11740 Delivery job site
P11750 Required on Site (ROS) date
NFPF.03.01.23 API Tank Accessories(M-026)
P11770 Issue of inquires
P11780 Issue of purchase order
P11790 Delivery Ex-Works
P11800 Transportation to Sudan
P11810 Custom Clearance
P11820 Delivery job site
P11830 Required on Site (ROS) date
NFPF.03.02 Instrumentation
NFPF.03.02.01 ESDV (J001)
P11850 Issue of inquires
P11860 Issue of purchase order
P11870 Delivery Ex-Works
P11880 Transportation to Sudan
P11890 Custom Clearance
P11900 Delivery job site
P11910 Required on Site (ROS) date
NFPF.03.02.02 CV & PCV (J002)
P11930 Issue of inquires
P11940 Issue of purchase order
P11950 Delivery Ex-Works
P11960 Transportation to Sudan
P11970 Custom Clearance
P11980 Delivery job site
P11990 Required on Site (ROS) date
NFPF.03.02.03 PSV & PVRV (J003)
P12010 Issue of inquires
P12020 Issue of purchase order
P12030 Delivery Ex-Works
P12040 Transportation to Sudan
P12050 Custom Clearance
P12060 Delivery job site
P12070 Required on Site (ROS) date
NFPF.03.02.04 Electronic Transmitters (J004)
P12090 Issue of inquires
P12100 Issue of purchase order
P12110 Delivery Ex-Works
P12120 Transportation to Sudan
P12130 Custom Clearance
P12140 Delivery job site
P12150 Required on Site (ROS) date
NFPF.03.02.05 Level Transmitters (J005)
P12170 Issue of inquires
P12180 Issue of purchase order
P12190 Delivery Ex-Works
P12200 Transportation to Sudan
P12210 Custom Clearance
P12220 Delivery job site
P12230 Required on Site (ROS) date
NFPF.03.02.06 Flow Meters (J006)
P12250 Issue of inquires
P12260 Issue of purchase order
P12270 Delivery Ex-Works
P12280 Transportation to Sudan
P12290 Custom Clearance
P12300 Delivery job site
P12310 Required on Site (ROS) date
NFPF.03.02.07 Gauges (J007)
P12330 Issue of inquires
P12340 Issue of purchase order
P12350 Delivery Ex-Works
P12360 Transportation to Sudan
P12370 Custom Clearance
P12380 Delivery job site
P12390 Required on Site (ROS) date
NFPF.03.02.08 FE (Orifice Plates) & RO (J008)
P12410 Issue of inquires
P12420 Issue of purchase order
P12430 Delivery Ex-Works
P12440 Transportation to Sudan
P12450 Custom Clearance
P12460 Delivery job site
P12470 Required on Site (ROS) date
NFPF.03.02.09 Product Allocation Metering Skid (J009)
P12490 Issue of inquires
P12500 Issue of purchase order
P12510 Delivery Ex-Works
P12520 Transportation to Sudan
P12530 Custom Clearance
P12540 Delivery job site
P12550 Required on Site (ROS) date
NFPF.03.02.10 Control System / Safety System (J010)
P12570 Issue of inquires
P12580 Issue of purchase order
P12590 Delivery Ex-Works
P12600 Transportation to Sudan
P12610 Custom Clearance
P12620 Delivery job site
P12630 Required on Site (ROS) date
NFPF.03.02.11 Fire & Gas Detection Devices (J011)
P12650 Issue of inquires
P12660 Issue of purchase order
P12670 Delivery Ex-Works
P12680 Transportation to Sudan
P12690 Custom Clearance
P12700 Delivery job site
P12710 Required on Site (ROS) date
NFPF.03.02.12 Building Fire Alarm System (J012)
P12730 Issue of inquires
P12740 Issue of purchase order
P12750 Delivery Ex-Works
P12760 Transportation to Sudan
P12770 Custom Clearance
P12780 Delivery job site
P12790 Required on Site (ROS) date
NFPF.03.02.13 Instrument Cables & Glands (J013)
P12810 Issue of inquires
P12820 Issue of purchase order
P12830 Delivery Ex-Works
P12840 Transportation to Sudan
P12850 Custom Clearance
P12860 Delivery job site
P12870 Required on Site (ROS) date
NFPF.03.02.14 Instrument Junction Boxes (J014)
P12890 Issue of inquires
P12900 Issue of purchase order
P12910 Delivery Ex-Works
P12920 Transportation to Sudan
P12930 Custom Clearance
P12940 Delivery job site
P12950 Required on Site (ROS) date
NFPF.03.02.15 Instrument Bulk Materials (J015)
P12970 Issue of inquires
P12980 Issue of purchase order
P12990 Delivery Ex-Works
P13000 Transportation to Sudan
P13010 Custom Clearance
P13020 Delivery job site
P13030 Required on Site (ROS) date
NFPF.03.03 Electrical
NFPF.03.03.01 6.6KV Switchgear (E001)
P13050 Issue of inquires
P13060 Issue of purchase order
P13070 Delivery Ex-Works
P13080 Transportation to Sudan
P13090 Custom Clearance
P13100 Delivery job site
P13110 Required on Site (ROS) date
NFPF.03.03.02 Power Transformers (E003)
P13130 Issue of inquires
P13140 Issue of purchase order
P13150 Delivery Ex-Works
P13160 Transportation to Sudan
P13170 Custom Clearance
P13180 Delivery job site
P13190 Required on Site (ROS) date
NFPF.03.03.03 400V Switchgear / Busducts(E004)
P13210 Issue of inquires
P13220 Issue of purchase order
P13230 Delivery Ex-Works
P13240 Transportation to Sudan
P13250 Custom Clearance
P13260 Delivery job site
P13270 Required on Site (ROS) date
NFPF.03.03.04 Diesel Generator Set (E005)
P13290 Issue of inquires
P13300 Issue of purchase order
P13310 Delivery Ex-Works
P13320 Transportation to Sudan
P13330 Custom Clearance
P13340 Delivery job site
P13350 Required on Site (ROS) date
NFPF.03.03.05 Electric Heaters (E006)
P13370 Issue of inquires
P13380 Issue of purchase order
P13390 Delivery Ex-Works
P13400 Transportation to Sudan
P13410 Custom Clearance
P13420 Delivery job site
P13430 Required on Site (ROS) date
NFPF.03.03.06 AC UPS System (E007)
P13450 Issue of inquires
P13460 Issue of purchase order
P13470 Delivery Ex-Works
P13480 Transportation to Sudan
P13490 Custom Clearance
P13500 Delivery job site
P13510 Required on Site (ROS) date
NFPF.03.03.07 DC UPS System (E008)
P13530 Issue of inquires
P13540 Issue of purchase order
P13550 Delivery Ex-Works
P13560 Transportation to Sudan
P13570 Custom Clearance
P13580 Delivery job site
P13590 Required on Site (ROS) date
NFPF.03.03.08 Lighting Poles & Junction Boxes (E009)
P13610 Issue of inquires
P13620 Issue of purchase order
P13630 Delivery Ex-Works
P13640 Transportation to Sudan
P13650 Custom Clearance
P13660 Delivery job site
P13670 Required on Site (ROS) date
NFPF.03.03.09 Cables, Glands & Termination Kits (E010)
P13690 Issue of inquires
P13700 Issue of purchase order
P13710 Delivery Ex-Works
P13720 Transportation to Sudan
P13730 Custom Clearance
P13740 Delivery job site
P13750 Required on Site (ROS) date
NFPF.03.03.10 Cable Trays and Accessories (E011)
P13770 Issue of inquires
P13780 Issue of purchase order
P13790 Delivery Ex-Works
P13800 Transportation to Sudan
P13810 Custom Clearance
P13820 Delivery job site
P13830 Required on Site (ROS) date
NFPF.03.03.11 Electrical Bulk Materials (E012)
P13850 Issue of inquires
P13860 Issue of purchase order
P13870 Delivery Ex-Works
P13880 Transportation to Sudan
P13890 Custom Clearance
P13900 Delivery job site
P13910 Required on Site (ROS) date
NFPF.03.03.12 Electrical Heat Tracing (E013)
P13930 Issue of inquires
P13940 Issue of purchase order
P13950 Delivery Ex-Works
P13960 Transportation to Sudan
P13970 Custom Clearance
P13980 Delivery job site
P13990 Required on Site (ROS) date
NFPF.03.03.13 33KV Switchgear at Power Station (E002)
P14010 Issue of inquires
P14020 Issue of purchase order
P14030 Delivery Ex-Works
P14040 Transportation to Sudan
P14050 Custom Clearance
P14060 Delivery job site
P14070 Required on Site (ROS) date
NFPF.03.04 Piping
NFPF.03.04.01 Valves (PIP001)
P14090 Issue of inquires
P14100 Issue of purchase order
P14110 Delivery Ex-Works
P14120 Transportation to Sudan
P14130 Custom Clearance
P14140 Delivery job site
P14150 Required on Site (ROS) date
NFPF.03.04.02 U/G Pipes & Fittings (PIP003)
P14170 Issue of inquires
P14180 Issue of purchase order
P14190 Delivery Ex-Works
P14200 Transportation to Sudan
P14210 Custom Clearance
P14220 Delivery job site
P14230 Required on Site (ROS) date
NFPF.03.04.03 Insulation Materials (PIP004)
P14250 Issue of inquires
P14260 Issue of purchase order
P14270 Delivery Ex-Works
P14280 Transportation to Sudan
P14290 Custom Clearance
P14300 Delivery job site
P14310 Required on Site (ROS) date
NFPF.03.04.04 Flexible Hoses (PIP005A)
P14330 Issue of inquires
P14340 Issue of purchase order
P14350 Delivery Ex-Works
P14360 Transportation to Sudan
P14370 Custom Clearance
P14380 Delivery job site
P14390 Required on Site (ROS) date
NFPF.03.04.05 Access Fittings (PIP005B)
P14410 Issue of inquires
P14420 Issue of purchase order
P14430 Delivery Ex-Works
P14440 Transportation to Sudan
P14450 Custom Clearance
P14460 Delivery job site
P14470 Required on Site (ROS) date
NFPF.03.04.06 Basket Strainer (PIP005C)
P14490 Issue of inquires
P14500 Issue of purchase order
P14510 Delivery Ex-Works
P14520 Transportation to Sudan
P14530 Custom Clearance
P14540 Delivery job site
P14550 Required on Site (ROS) date
NFPF.03.04.07 Y Type Strainer (PIP005D)
P14570 Issue of inquires
P14580 Issue of purchase order
P14590 Delivery Ex-Works
P14600 Transportation to Sudan
P14610 Custom Clearance
P14620 Delivery job site
P14630 Required on Site (ROS) date
NFPF.03.04.08 Flame Arrestor (PIP005E)
P14650 Issue of inquires
P14660 Issue of purchase order
P14670 Delivery Ex-Works
P14680 Transportation to Sudan
P14690 Custom Clearance
P14700 Delivery job site
P14710 Required on Site (ROS) date
NFPF.03.04.09 Expansion Bellow (PIP005F)
P14730 Issue of inquires
P14740 Issue of purchase order
P14750 Delivery Ex-Works
P14760 Transportation to Sudan
P14770 Custom Clearance
P14780 Delivery job site
P14790 Required on Site (ROS) date
NFPF.03.04.10 A/G Pipes & Fittings (PIP006)
P14810 Issue of inquires
P14820 Issue of purchase order
P14830 Delivery Ex-Works
P14840 Transportation to Sudan
P14850 Custom Clearance
P14860 Delivery job site
P14870 Required on Site (ROS) date
NFPF.03.04.11 Painting (PIP008)
P14890 Issue of inquires
P14900 Issue of purchase order
P14910 Delivery Ex-Works
P14920 Transportation to Sudan
P14930 Custom Clearance
P14940 Delivery job site
P14950 Required on Site (ROS) date
NFPF.03.04.12 Fire Fighting Equipment (PIP009)
P14970 Issue of inquires
P14980 Issue of purchase order
P14990 Delivery Ex-Works
P15000 Transportation to Sudan
P15010 Custom Clearance
P15020 Delivery job site
P15030 Required on Site (ROS) date
NFPF.03.05 Cathodic Protection
NFPF.03.05.01 CP Materials under Tank Bottom
P15050 Issue of inquires
P15060 Issue of purchase order
P15070 Delivery Ex-Works
P15080 Transportation to Sudan
P15090 Custom Clearance
P15100 Delivery job site
P15110 Required on Site (ROS) date
NFPF.03.05.02 CP Materials for Pilings
P15130 Issue of inquires
P15140 Issue of purchase order
P15150 Delivery Ex-Works
P15160 Transportation to Sudan
P15170 Custom Clearance
P15180 Delivery job site
P15190 Required on Site (ROS) date
NFPF.03.05.03 Aluminium Alloy Sacrificial Anode
P15210 Issue of inquires
P15220 Issue of purchase order
P15230 Delivery Ex-Works
P15240 Transportation to Sudan
P15250 Custom Clearance
P15260 Delivery job site
P15270 Required on Site (ROS) date
NFPF.03.06 Civil
NFPF.03.06.01 Piling Material
P15290 Issue of inquires
P15300 Issue of purchase order
P15310 Delivery Ex-Works
P15320 Transportation to Sudan
P15330 Custom Clearance
P15340 Delivery job site
P15350 Required on Site (ROS) date
NFPF.03.06.02 Structual Steel
P15370 Issue of inquires
P15380 Issue of purchase order
P15390 Delivery Ex-Works
P15400 Transportation to Sudan
P15410 Custom Clearance
P15420 Delivery job site
P15430 Required on Site (ROS) date
NFPF.03.06.03 Fencing Material
P15450 Issue of inquires
P15460 Issue of purchase order
P15470 Delivery Ex-Works
P15480 Transportation to Sudan
P15490 Custom Clearance
P15500 Delivery job site
P15510 Required on Site (ROS) date
NFPF.03.06.04 Building Material
P15530 Issue of inquires
P15540 Issue of purchase order
P15550 Delivery Ex-Works
P15560 Transportation to Sudan
P15570 Custom Clearance
P15580 Delivery job site
P15590 Required on Site (ROS) date
NFPF.03.06.05 Concrete Material
P15610 Issue of inquires
P15620 Issue of purchase order
P15630 Delivery Ex-Works
P15640 Transportation to Sudan
P15650 Custom Clearance
P15660 Delivery job site
P15670 Required on Site (ROS) date
NFPF.03.06.06 Civil Specialty Items
P15690 Issue of inquires
P15700 Issue of purchase order
P15710 Delivery Ex-Works
P15720 Transportation to Sudan
P15730 Custom Clearance
P15740 Delivery job site
P15750 Required on Site (ROS) date
NFPF.03.06.07 Culverts Material
P15770 Issue of inquires
P15780 Issue of purchase order
P15790 Delivery Ex-Works
P15800 Transportation to Sudan
P15810 Custom Clearance
P15820 Delivery job site
P15830 Required on Site (ROS) date
NFPF.04 CONSTRUCTION
NFPF.04.01 Site Mobilization
NFPF.04.01.01 Site Mobilization
C10010 Civil team mobilize to jobsite
C10020 Installation team mobilize to jobsite
NFPF.04.01.02 Construction of Contractor’s Temporary Camp
C10030 Piling works
C10040 Water well drilling
C10050 Steel structure works
C10060 Building erection
C10070 Power supply and water supply
NFPF.04.02 Civil Construction
NFPF.04.02.01 Site Survey
C10080 Topographical geotechnical survey
NFPF.04.02.02 Tank Foundation(Crude Oil Storage TK12001)
C10090 Excavation
C10100 Backfilling / compaction (1st-3rd layers)
C10110 Installation of PVC detection pipes
C10120 Backfilling / compaction (other layers)
C10130 Crush gravel ring beam
C10140 Beding sand (1st layer)
C10150 Installation of CP grid
C10160 Bedding sand completed
NFPF.04.02.03 Tank Foundation (Produced Water Skim TK-12002A)
C10180 Excavation
C10190 Backfilling / compaction (1st-3rd layers)
C10200 Installation of PVC detection pipes
C10210 Backfilling / compaction (other layers)
C10220 Crush gravel ring beam
C10230 Beding sand (1st layer)
C10240 Installation of CP grid
C10250 Bedding sand completed
NFPF.04.02.04 Tank Foundation (Produced Water Skim TK-12002B)
C10270 Excavation
C10280 Backfilling / compaction (1st-3rd layers)
C10290 Installation of PVC detection pipes
C10300 Backfilling / compaction (other layers)
C10310 Crush gravel ring beam
C10320 Beding sand (1st layer)
C10330 Installation of CP grid
C10340 Bedding sand completed
NFPF.04.02.05 Tank Foundation (Diesel Fuel Storage TK-12004)
C10360 Excavation
C10370 Backfilling / compaction (1st-3rd layers)
C10380 Installation of PVC detection pipes
C10390 Backfilling / compaction (other layers)
C10400 Crush gravel ring beam
C10410 Beding sand (1st layer)
C10420 Installation of CP grid
C10430 Bedding sand completed
NFPF.04.02.06 Piling Works
C10440 Fabrication of piling pipes
C10450 Piling for pipe racks
C10460 Piling for building
C10470 Piling for equipment foundations and others
C10480 Wedling of pile caps
NFPF.04.02.07 Fencing and Gates
C10490 Cast and install concrete base
C10500 Install poles
C10510 Install fencing chain and gates
NFPF.04.02.08 Steel Structure for Pipe Rack
C10520 Structural steel blasting/priming
C10530 Structural steel prefabrication
C10540 Piperack erection
C10550 Final painting
NFPF.04.02.09 Other Steel Structure Work
C10560 Pipe sleeper and supports works
C10570 Cross-over,platforms,ladders&hand railing
C10580 Support for cable trays and cable ducts
C10590 Foundation steel light poles,flood light mast
NFPF.04.02.11 Control Building Erection
C10600 Blast & fabrication of foundation structure
C10610 Erection of foundation structure
C10620 Erection of support frame
C10630 Erection of floor / wall / roof
C10640 Electrical / furnishment / sanitary etc.
NFPF.04.02.12 33KV Substation Building Erection
C10650 Blast & fabrication of foundation structure
C10660 Erection of foundation structure
C10670 Erection of support frame
C10680 Erection of floor / wall / roof
C10690 Electrical / funishment / sanitary etc.
NFPF.04.02.13 Inst./Mech. Maintanence Shop Erection
C10700 Blast & fabrication of foundation structure
C10710 Erection of foundation structure
C10720 Erection of support frame
C10730 Erection of floor / wall / roof
C10740 2.0T SWL overhead crane installation in Workshop
C10750 Concrete floor for workshop
C10760 Install equpment, tools and machinery
C10770 Electrical / furnishment etc.
NFPF.04.02.14 Other Building and Shed
C10780 Erection of Guard house
C10790 D.G set shed
C10800 Instrument air package shed
C10810 Chemical injection skid & chemical storage shed
C10820 Export metering shed
C10830 Water treatment shed
NFPF.04.02.15 Road & Grading
C10840 Construction of 6m wide road
C10850 Final grading
C10860 Leveled with crushed stone
C10870 Concrete work for chemical storage shed
C10880 Installation of windsock
C11110 Installation of concrete culvert
NFPF.04.02.16 Tank Farm
C11000 Backfilling of earthen bund
C11220 Construction of internal concrete cover
C11360 Curb wall between the adjacent tanks
C11400 Asphaltic surfacing
NFPF.04.03 Mechanical Equipment Erection
NFPF.04.03.01 Tank Erection (Crude Storage TK-12001)
C10890 Tank plates fabrication (cutting)
C10900 Rolling of tank plates
C10910 Welding of bottom plates
C10920 Welding of 1st course
C10930 Erection of tank roof
C10940 Welding of other courses
C10950 Installation of accessories
C10960 Water settlement test
C10970 Blasting / painting
C10980 Insulation
C10990 Installation of firewater ring & foam
NFPF.04.03.02 Tank Erection (PW TK-12002A)
C11010 Prefab./Rolling of internal tank plates
C11020 Welding / installation of internal tank
C11030 Prefab./rolling of bottom & shell plates
C11040 Welding of bottom plates
C11050 Welding of course plates
C11060 Prefab./installation of internal assemble
C11070 Erection of tank roof
C11080 Erection of lader & accessories
C11090 Water settlement test
C11100 Sand blasting and painting
NFPF.04.03.03 Tank Erection (PW TK-12002B)
C11120 Prefab./Rolling of internal tank plates
C11130 Welding / installation of internal tank
C11140 Prefab./rolling of bottom & shell plates
C11150 Welding of bottom plates
C11160 Welding of course plates
C11170 Prefab./installation of internal assemble
C11180 Erection of tank roof
C11190 Erection of lader & accessories
C11200 Water settlement test
C11210 Sand blasting and painting
NFPF.04.03.04 Tank Erection (Diesel TK-12004)
C11230 Tank plates fabrication (cutting)
C11240 Rolling of tank plates
C11250 Welding of bottom plates
C11260 Welding of 1st course
C11270 Erection of tank roof
C11280 Welding of other courses
C11290 Installation of accessories
C11300 Water settlement test
C11310 Blasting / painting
C11320 Insulation
NFPF.04.03.05 FWKO (V-12001A/B)
C11330 Fabricate & install steell base frame
C11340 Setting,initial align. & associated installtion
C11350 Final alignment and insulation
NFPF.04.03.06 Test Separator (V-12003)
C11370 Fabricate & install steell base frame
C11380 Setting,intial align. & associated installtion
C11390 Final alignment and insulation
NFPF.04.03.07 Heater Treaters (V-12002A/B)
C11410 Fabricate & install steell base frame
C11420 Setting,initial align. & associated installtion
C11430 Final alignment
NFPF.04.03.08 CPI Separator (X-12001A/B)
C11450 Fabricate & install steell base frame
C11460 Setting,initial align. & associated installtion
C11470 Final alignment and insulation
NFPF.04.03.09 Gas Boot (V-12013)
C11490 Fabricate & install steell base frame
C11500 Setting,initial align. & associated installtion
C11510 Final alignment
NFPF.04.03.10 Diesel Fuel Coale.Filters (F-12002A-F,F-12012AB
C11530 Fabricate & install steell base frame
C11540 Setting,initial align. & associated installtion
C11550 Final alignment
NFPF.04.03.11 Flare Stack(SK-12011)
C11570 Fabricate & install steell base frame
C11580 Setting,initial align. & associated installtion
C11590 Final alignment
NFPF.04.03.12 Portable Water Treatment Package(SK-12005)
C11610 Fabricate & install steell base frame
C11620 Setting,initial align. & associated installtion
C11630 Final alignment
NFPF.04.03.13 Flare KO Drum (V-12011)
C11650 Fabricate & install steell base frame
C11660 Setting,initial align. & associated installtion
C11670 Final alignment and insulation
NFPF.04.03.14 Floating Oil Skimmer(X-12012)
C11690 Fabricate & install steell base frame
C11700 Setting,initial align. & associated installtion
C11710 Final alignment
NFPF.04.03.15 Fuel Gas Scrubber(V-12012)
C11730 Fabricate & install steell base frame
C11740 Setting,initial align. & associated installtion
C11750 Final alignment
NFPF.04.03.16 Chemical Injection Skid(Demulsifier SK-12001)
C11770 Fabricate & install steell base frame
C11780 Setting,initial align. & associated installtion
C11790 Final alignment
NFPF.04.03.17 Chemical Injection Skid (Reverse SK-12003)
C11810 Fabricate & install steell base frame
C11820 Setting,initial align. & associated installtion
C11830 Final alignment
NFPF.04.03.18 PPD Chemical Injection Skid(SK-12004)
C11850 Fabricate & install steell base frame
C11860 Setting,initial align. & associated installtion
C11870 Final alignment
NFPF.04.03.20 Closed Drain Sump Skid(X-12003A)
C11890 Fabricate & install steell base frame
C11900 Setting,initial align. & associated installtion
C11910 Final alignment
NFPF.04.03.21 Open Drain Sump (X-12003B)
C11930 Fabricate & install steell base frame
C11940 Setting,initial align. & associated installtion
C11950 Final alignment
NFPF.04.03.24 Instrument Air Package(SK-K-12001)
C11970 Fabricate & install steell base frame
C11980 Setting,initial align. & associated installtion
C11990 Final alignment
NFPF.04.03.25 Nitrogen Generation Package(SK-12010)
C12010 Fabricate & install steell base frame
C12020 Setting,initial align. & associated installtion
C12030 Final alignment
NFPF.04.03.26 Heat Exchangers(E-12001A/B)
C12050 Fabricate & install steell base frame
C12060 Setting,initial align. & associated installtion
C12070 Final alignment and insulation
NFPF.04.03.27 Crude Oil Export Pumps(Centrifugal P-12001A/B/C)
C12090 Fabricate & install steell base frame
C12100 Setting,initial align. & associated installtion
C12110 Final alignment
NFPF.04.03.28 Crude Oil Export Pump(Screw P-12002)
C12130 Fabricate & install steell base frame
C12140 Setting,initial align. & associated installtion
C12150 Final alignment
NFPF.04.03.29 Emergency Gen./Driver (G-12001/GE-12001)
C12170 Fabricate & install steell base frame
C12180 Setting,initial align. & associated installtion
C12190 Final alignment
NFPF.04.03.30 Drain Oil Pumps (P-12003A/B/C/D)
C12210 Fabricate & install steell base frame
C12220 Setting,initial align. & associated installtion
C12230 Final alignment
NFPF.04.03.31 Portable Skimmed Oil Pump(P-12004)
C12250 Fabricate & install steell base frame
C12260 Setting,initial align. & associated installtion
C12270 Final alignment
NFPF.04.03.32 Portable Water Distribution Pumps(P-12007A/B)
C12290 Fabricate & install steell base frame
C12300 Setting,initial align. & associated installtion
C12310 Final alignment
NFPF.04.03.33 Diesel Transfer Pumps (P-12009A/B/C)
C12330 Fabricate & install steell base frame
C12340 Setting,initial align. & associated installtion
C12350 Final alignment
NFPF.04.03.34 Diesel Oil Transfer Pumps (P-12010A/B)
C12370 Fabricate & install steell base frame
C12380 Setting,initial align. & associated installtion
C12390 Final alignment
NFPF.04.03.35 Flare K.O. Drum Pumps (Centrifugal P-12011A/B)
C12410 Fabricate & install steell base frame
C12420 Setting,initial align. & associated installtion
C12430 Final alignment
NFPF.04.03.36 Diesel Oil Unloading Pumps(P-12014A/B)
C12450 Fabricate & install steell base frame
C12460 Setting,initial align. & associated installtion
C12470 Final alignment
NFPF.04.03.37 Metering Skid (SK-12002)
C12490 Fabricate & install steell base frame
C12500 Setting,initial align. & associated installtion
C12510 Final alignment
NFPF.04.03.38 Water Level Control Box (X-12006A/B)
C12530 Fabricate & install steell base frame
C12540 Setting,initial align. & associated installtion
C12550 Final alignment
NFPF.04.04 Pipeline / Piping Erection
NFPF.04.04.01 Underground Piping
C12560 Trench excavation
C12570 Welding
C12580 NDT
C12590 Flushing
C12600 Hydrotesting
C12610 Joint coating
C12620 Trench backfilling
NFPF.04.04.02 Aboveground Piping
C12630 Blast and prime for line pipes
C12640 Prefabrication
C12650 Welding / Erection on pipe rack
C12660 Welding / erection for others
C12670 Hydrotesting
C12680 Flushing
C12690 Final painting
C12700 Insulation
NFPF.04.04.03 Water Supply Flowline
C12710 Excavation of trenching
C12720 Welding
C12730 Joint coating and backfilling
C12740 Hydrotesting and tie-ins
NFPF.04.05 Electrical Installation
NFPF.04.05.01 Power and Control Cable
C12750 Installation of cable tray
C12760 Cable pulling
C12770 Meggar test
C12780 Cable termination
C12790 Continuity / Meggar test
NFPF.04.05.02 Electrical Equipment in MCC
C12800 Install power & motor control centre 400V
C12810 Install/position 6.6KV switchgear
C12820 Cabling within package - 6.6kV switchgear
C12830 Testing - 6.6kV switchgear
C12840 Install/position DB panel 400v
C12850 Cabling/termination - DB panels
C12860 Testing - DB panels
C12870 Install electrical motors
C12880 Cabling/termination - electrical motors
C12890 Testing - electrical motors
C12900 Install/position A.C. UPS
C12910 Cabling/termination - AC UPS
C12920 Testing - AC UPS
C12930 Install/position D.C. power supply unit
C12940 Cabling/termination- DC unit
C12950 Testing - DC unit
NFPF.04.05.03 Electrical Equipment in Substation
C12960 Transformers installation
C12970 Cabling/termination - transformers
C12980 Testing - transformers
C12990 Install/position 33kV switchgears
C13000 Cabling/termination - switchgears
C13010 Testing - switchgears
NFPF.04.05.04 Other Electrical Equipment Installation
C13020 Install diesel generator 400V
C13030 Cabling/termination - diesel generator
C13040 Testing - diesel generator
C13050 Install local control panels
C13060 Cabling/termination - panels
C13070 Testing - panels
NFPF.04.05.05 Lighting
C13080 Laying the buried cables
C13090 Installation of lighting poles
C13100 Outdoor lighting
C13110 Indoor lightings
NFPF.04.05.06 Earthing / CP
C13120 Install copper rod
C13130 Pull looping cables
C13140 Grounded to equipment
C13150 Testing
NFPF.04.05.07 Electrical Heat Tracing System
C13160 Install heat tracing elements
C13170 Install heat tracing panels
NFPF.04.05.08 Portable Power Station
C13180 Dismentling and transportation from Diffra
C13190 Installation in Neem
C13200 Pre-commissioning and commissioning
NFPF.04.06 Instrumentation Installation
NFPF.04.06.01 Cabling
C13210 Cable tray installation/alignment
C13220 Cable pulling/laying
C13230 Cable laying from field instrument to JB
C13240 Continuity test
C13250 Cable glanding & termination
C13260 Look check
NFPF.04.06.02 Instrumentation in Control Room
C13270 Install operator interface stations
C13280 Cabling and termination - operator station
C13290 Testing - operator station
C13300 Install Operator push-button station
C13310 Cabling and termination- push button station
C13320 Testing - push button station
C13330 Install building fire alarm panel
C13340 Cabling/termination- fire alram panel
C13350 Testing - fire alarm panel
C13360 Install control system&marshalling cabinets
C13370 Cabling/termination- control cabinets
C13380 Testing - control system
C13390 Install Safety system&mashalling cabinets
C13400 Cabling/termination-safety cabintes
C13410 Testing - safety system
C13420 Install PLC panels
C13430 Cabling/termination - PLC panels
C13440 Testing - PLC system
NFPF.04.06.04 Field Instrumenation
C13450 Install/wiring of flow meter
C13460 Install/wiring of transmitters
C13470 Install/wiring of gauges
C13480 Install/wiring of ESDV
C13490 Install/wiring of CV & PCV
C13500 Install/wiring of PSV & PVRV
C13510 Install/wiring junction boxes
C13520 Install air tubing
NFPF.04.08 Safety Equipment Installation
C13530 Safety equipment installation
NFPF.04.09 Tie-ins Into the Exist. Systems & Other Facility
C13540 Tie-ins with other facilities
NFPF.05 MECHANICAL
NFPF.05.01 Pre-Commissioning
C13550 Pipes & pressurized equip.hydrotest
C13560 Control of rotating equipment
C13570 Verification,calibratoin and test of instrument
C13580 Verification of electrical equipment
C13590 Verification of electrical circuits
C13600 Test of safety equipment
NFPF.05.02 Mechanical Completion
C13610 Mechanical Completion
NFPF.06 PROVISIONAL ACCEPTANCE
NFPF.06.01 Commissioning
C13620 Commissioning by system
C13630 Performance testing
NFPF.06.02 Provisional Acceptance
C13640 Provisional Acceptance
SANJEEV KOUL
User offline. Last seen 16 years 49 weeks ago. Offline
Joined: 1 Mar 2007
Posts: 18
hi Mr Krishnamurhi ;
Thanks for ur valuable guidance but i need a detailed subactivity breakdown as in a P3 programme.Brekdown should cover civil , mech , elect , inst for pipeline and stations ; activity duration ;and clearly list out the critical activities in the sample P3 programme.
Krishnamurhi Rama...
User offline. Last seen 10 years 33 weeks ago. Offline
Joined: 15 Oct 2004
Posts: 13
Sanjeev,

Please find below the major activities for a Pipeline Project. You need to add or delete to suit your requirements


Concept Study (CSR):
Preparation of BFD
Basis for the study
Scope of Work
Site Visits & Data Collections
Prepare Deliverables
Prepare company estimate
Prepare EPC Tender doc.
Prepare commercial part of EPC doc
Integrate Commercial & Tech parts of Tender
Bidding period
Bid clarification & evaluation
Receipt of Commercial Bid
Obtain Approval Of Tender Board
Prepare Award Recommendation
Award of EPC Contract
Kick-off Meeting
Site Establishments/Camp const/manpower/eqpt mobilisation

Engineering
Pipeline
Site Survey - Pipelines
Overall / Unit Plot Plans - Prepare/ Issue/ Review
Wall thickness / Material Selection Reports- Prepare/Issue/Approve
Piping Key Plans
Piping Isometrics
Pipeline Route Alignment Sheets / Other Dwgs- Prepare/Issue/AFC
Procurement
Line Pipes / valves / flanges & fittings / Electrical items ? Cathodic Protection
Issue Specs
Float Enquiry
Receipt of Offers
Technical Recommendations
MR and PO Placement
Receipt of Vendor Dwgs for Approval
Vendor Dwgs Approval
Mfg & Site Del
Construction
ROW
Trench Excavation
Trench Cleaning
Collection of Sand Padding Material
Pre Padding
Pipeline Stringing
Cutting, edge preparation, bending
Alignment / Welding
NDT (Above Ground)
Joint Coating (Above Ground)
Lowering
Tie In
Post Pading
Back Filling , Windrow
Pigging/Cleaning/Gauging/Hydrotesting
Dewatering & drying
Installation of Marker Posts
Installation of CP System


Cheers
Hassan Emam
User offline. Last seen 17 years 30 weeks ago. Offline
Joined: 20 Dec 2006
Posts: 18
Groups: None
to get all the work to be done check the project BOQ may be you will need more breakdown but i think it will be ok for a master plan. For the duration it’s relation between Manpower, Production rates and the quantity of work to be done. I hope this will help you