Maintain Multiple Baseline with 1 step

R
Rami Louka 👤 Member for 6 years 7 months

Hi Guys,

I am dealing with window analysis with a lot if windows/projects/updates to compare, so here is my question:

How can I maintain multiple baselines to project in 1 step?? 

Again: I want to maintain two or three project to my current opened project in 1 step (1 click), is there a way sto select multiple projects and maintain them as baseline in 1 step?

 

Thanks for the help

Z
Zoltan Palffy 👤 Member for 17 years

its a 2 step process you can compare up to 3 baselines

1st select project maintain basleine then select assign baseline 

do this for up to 3 baselines 

R
Rodel Marasigan 👤 Member for 19 years 9 months

Hi Rami,

That is not possible because the database only accept one at a time maintaining baseline and the same with assigning Baseline.

Featured Partner

Top Posters

Hamzah Ahmed
0 posts
Quinton van Eeden
3 posts
Sunchana Johnston
12 posts
Akram Hammam Mohamed
17 posts
Sagar Raut
14 posts
Patricio_aoa
0 posts
James Williams
75 posts
Philip Assou-Dodji
1 posts
jeoffrey reyes
15 posts
markg
0 posts