Citgo Kerosene Sample Schedule
This schedule is based on 4 projects going through the shop in successive order. Planning includes the JIT delivery of the next batch of materials in order to continue daily progression and maintain safe, unrestricted walk areas and floor space.
Pipe fitting and Welding are based on the Page of Nation man hours per size of weld, pipe schedule: WT(wall thickness)and material properties. Many other factors come into play depending on the type of material.
Industrial Planning and Scheduling Checklist
This is general checklist for a type 2 schedule dealing with industrial construction. Type 3, 4 and 5 are also developed from this information as scopes are developed from detailed engineered drawings.
Boise Sample Schedule
This schedule is for the manufacture of process ducting. The ducting material is stainless steel. This included the shearing, rolling, fitting/tacking and then welding of all seams. It also included the fabrication of flanges for connecting the duct work.