Kerbs & Paving

Task / DescriptionSlow  Ave  Fast   Units Concrete Slabs, laid on bedding, to slight falls2.7 -  4.2  m2/hr Concrete Slabs, laid on bedding, to steep falls2.3 -  2.7  m2/hr Concrete Slabs, laid in mortar, to slight falls1.5 -  2.3  m2/hr Concrete Slabs, laid in mortar, to steep falls1.1 -  1.5  m2/hr Concrete Slabs, laid on sand, to slight falls1.7 -  2.8  m2/hr Concrete Slabs, laid on sand, to steep falls1.6 -  1.9  m2/hr Cobble Stones, laid in mortar, no patterns-  0.3 -   m2/hr Cobble Stones, laid in mortar, with patterns-  0.2 -   m2/hr Artificial Stone, laid on sand, with patterns-  2.5 -   m2/hr Brick Paviors, in mortar, straight joints0.9 1.3 1.9  m2/hr Brick Paviors, in mortar, herringbone pattern-  1.0 1.2  m2/hr Gravel Paths, including preparation of sub-base-  10.5 -   m2/hr Concrete Paths, 100mm thick, including preparation of sub-base-  2.5 -   m2/hr Concrete Kerbs or Channels, laid straight-  6.2 -   m/hr Concrete Kerbs or Channels, laid to 5m radius-  4.5 -   m/hr Concrete Kerbs or Channels, laid to 10m radius-  5.0 -   m/hr Concrete Kerbs or Channels, laid to 20m radius-  5.5 -   m/hr Stone/Granite Kerbs or Channels, laid straight-  3.5 -   m/hr Concrete Edging, laid straight-  7.7 -   m/hr Concrete Edging, laid to 5m radius-  5.8 -   m/hr Concrete Edging, laid to 10m radius-  6.2 -   m/hr Concrete Edging, laid to 20m radius-  7.1 -   m/hr Cutting and Fitting Ends, Concrete Kerbs-  6.6 -   no/hr Cutting and Fitting Ends, Channels-  5.8 -   no/hr Cutting and Fitting Ends, Concrete Edging-  8.3 -   no/hr