Partitioning
Task / DescriptionSlow Ave Fast Units Timber Studding5.9 6.2 6.8 m/hr Metalwork System (MF) Studding1.6 2.0 2.5 m2/hr Tape, Joint Sand and Top Coat Plasterboard1.1 1.5 2.1 m2/hr Skimming to Plasterboards5.5 6.1 6.7 m2/hr 5mm Hardboard Paneling, excluding studding time- 3.2 3.6 m2/hr 100mm Pine Paneling, excluding studding time0.8 1.1 1.4 m2/hr Quality Hardwood Paneling, excluding studding time0.3 0.5 0.6 m2/hr Fix 50mm Rocksil Insulation to cavities- 17.8 20.2 m2/hr Fix Timber Studding and Paramount Partitions2.6 3.0 3.4 m2/hr Fix Timber Studding and Demountable Partitions0.8 1.1 1.6 m2/hr Fix Timber Studding and Hills Duraboard Partitions3.0 3.5 3.9 m2/hr Fix Timber Studding and Gyproc Laminated Partitions2.2 2.6 2.9 m2/hr Stud Partitions, Butt Jointed, nailed5.9 7.3 9.1 m/hr Stud Partitions, Butt Jointed, screwed3.5 4.6 5.8 m/hr Stud Partitions, T&G Jointed, nailed2.9 3.6 4.8 m/hr Stud Partitions, T&G Jointed, screwed2.1 2.8 3.7 m/hr Stud Partitions, Fix Sole Plates- 11.1 - m/hr Stud Partitions, Fix Noggins- 16.6 - m/hr Stud Partitions, Drill 25-40mm Holes- 28.5 - no/hr Fix Toilet Partition System, Separation panels- 0.8 - hrs/no Fix Toilet Partition System, Wall Front Panels- 0.7 - hrs/no Fix Toilet Partition System, Separation Front Panels- 0.6 - hrs/no Fix Toilet Partition System, End Front Panels- 0.6 - hrs/no Fix Toilet Partition System, Hang Door to Panel- 0.4 - hrs/no Fix Toilet Partition System, Hand Door plugged to wall- 0.6 - hrs/no Fix Toilet Partition System, Fix Head Rails- 0.1 - hrs/no
Book navigation for Partitioning
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Partitioning
-
-
-
-
-