Electrical System
Task / DescriptionSlow Ave Fast Units Railway Station 1st Fix- 38.0 - wks Railway Station 2nd Fix- 16.0 - wks Railway Station T&C- 8.0 - wks Cable Installation, 1 cable laid in trench and protect- 6.2 - m/hr Cable Installation, 2 cable laid in trench and protect- 5.6 - m/hr Cable Installation, 5 cable laid in trench and protect- 4.3 - m/hr Cable Installation, 7 cable laid in trench and protect- 3.7 - m/hr Cable Installation, 8 cable laid in trench and protect- 3.5 - m/hr Cable Installation, 2 cable laid in trench and protect, 100mm dia- 1.8 - m/hr Cable Installation, 2 cable laid in trench and protect, 135mm dia- 1.6 - m/hr Cable Installation, 3 cable laid in trench and protect, 100mm dia- 1.0 1.5 m/hr Cable Installation, 6 cable laid in trench and protect, 100mm dia- 0.7 1.2 m/hr Cable Installation, 4 cable laid in trench and protect, 150mm dia0.7 1.2 3.1 m/hr Cable Installation, 36 cable laid in trench and protect, 100mm dia- 0.2 - m/hr Cable Installation, 10 cable laid in trench and protect, 100mm dia- 0.5 - m/hr Cable Installation, 1 cable laid in trench and protect, 300mm dia- 1.3 - m/hr
Book navigation for Electrical System
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Electrical System
-
-
-
-
-
-
-
-
-
-
-
-
-