Reinforcement Ratios
Task / DescriptionSlow Ave Fast Units Pile Cap, Concrete m3 x Ratio = Rebar Tonnes- 14.8 - % ratio Base Slab, Concrete m3 x Ratio = Rebar Tonnes- 13.2 14.1 % ratio Suspended Slab, Concrete m3 x Ratio = Rebar Tonnes- 20.6 25.6 % ratio Platform Slab, Concrete m3 x Ratio = Rebar Tonnes- 15.6 - % ratio Columns, Concrete m3 x Ratio = Rebar Tonnes15.8 18.7 28.7 % ratio Walls, Concrete m3 x Ratio = Rebar Tonnes14.7 15.0 - % ratio