P6 ver 17 help please, copying WBS

Morning all, 

I have a schedule and I'm creating another but I need to copy a section of WBS across both using the same ID's. I wouldn't think this a problem as they're different project IDs but P6 keeps renumbering them.

Any ideas if this can be stopped so it keeps the same IDs in both schedules?

 

Thanks

Thom

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

Specify the interval to summarize and store resource spreads

Dear Members

Could you please explain to me how does the "Specify the interval to summarize and store resource spreads" function works?

I read about it but nothing happen when i changed options.

Please help me with explains and template to understand it.

capture.png

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

Changing activity start/finish date and duration after being baselined

T
troon sigma 👤 Member for 6 years 2 months

Hi,

Suppose plan has been created and baselined. Actual data has also been entered. 



Now, I realize one particular activity had its start/finish date entered very wrong. Is there a way now to change those planned dates?

 

thanks

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

Primavera Baseline - Even Without It, Data is There, howcome?

T
troon sigma 👤 Member for 6 years 2 months

Hi,

I understand purpose of having baseline - it is used for comparing actual data with original data. 

However, I tried this and found out that Primavera maintains baseline data even if we did not create it.

1. I make a plan.

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

Problems in importing Excel files

Hi Everybody ,

I exported a resource assignement excel file to change budgeted units and other data, when importing the resource is doubled (as shown in the attched image) , i recalculated the assignement costs , but still i will have to manualy remove the doubled resource and this will be a tediuos process as there is a lot of af activities .

Hope to find a fix to this problem.

Regards[[wysiwyg_imageupload::]]

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

Primavera EPPM Test Environment Permissions

S
Steven Reed 👤 Member for 16 years 9 months

I have Primavera EPPM installed on a test server. I have created an EPS, OBS, and user security privileges on the test server. When my IT department moves me to the ‘live’ (or some call it a production) environment.
Can I copy the work I created in the test environment to the production environment?

I don’t want to perform rework when we move to the live server.

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

S Curve Manhour- Baseline , Actual , Forecast

Hello Everyone,

 

I would like to make a S Curve in Primavera which shows Planned, Actual and Forecast S Curve.

The basis of S Curve to be manhours / Week.

Can S Curve in Primavera show % Planned per week as Lables like in Excel.

I want to calculate the S Curve which shows end of the Week Palnned % and Actuals (Not start)

Please guide me.

 

Regards

Jithin

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

Project Updates Not Saving

C
C Walker 👤 Member for 12 years 8 months

My users are informing me that schedule changes they are making are occasionally not showing up the next time they log into P6.  This includes status updates, activity code changes, and activity deletions.  

This has been more prevalent since our upgrade to P6 18.8.5

Anyone else having these issues?

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts