Michael Lepage uses Resources (Material) for Cost Loading - why? (instead of cost or expenses)

J
John Reeves 👤 Member for 13 years 1 month

Michael Lepage uses Resources (Material) for Cost Loading - why? (instead of cost or expenses) I had always heard that was better but why not put costs where costs would normally go - in the cost setup??

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

Show activity dates in EPS view in EPPM

C
Chary Chary 👤 Member for 10 years 2 months

Dear all,

I have a need to see dates of some of the milestones of a project in EPS view in EPPMIn general 

In general I can see, that some of the dates can be shown in EPS view:

e.g. :

Start / Finish

BL Start / BL finish

 

But what if I create a Milestone1 for every project and then want to see for every project

Milestone1 Start

BL Milestone1 Start

 

can this be done?

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

So it DOES NOTE WORK to export and import LAYOUTS with User Text and Defined columns

J
John Reeves 👤 Member for 13 years 1 month

WARNING: So it DOES NOTE WORK to export and import LAYOUTS with User Text and Defined columns.  I am doing it with computer right next to each other.  Everything is there except those.  They can be added and the data is there.  Whats with that?  Anything else related to this I should know?  The versions are basically the same.  I might use those columns more than most - during my draft process because setting up and changing "codes" are more of a hassle until you know the data better.

 

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

Actual Labor Units Should Not be Budgeted Labor Units If Performance is not as per baseline

T
troon sigma 👤 Member for 6 years 2 months

Hi experts,

 

After I enter actual progress (by changing remaining duration), I also want to change actual or remaining Labor Budgeted Units.  I know by default they also change in proportion to Duration % but may be resource has worked less or more so I would want to change it. I can change it, no problem.

 

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

P6 User Preferences

Hello,

Could someone help me to understand what is the diffrence and when or how to use these two options given in user preferences -calculations resource assignments title ?

When adding or removing multiple resource assigments on activities

1- Preserve the units, duration and units/time for existing assignments

2- Recalculate the units, duration and units/time for existing assignments based on the activity duration type.

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts

Forum Sponsor

Top Posters

GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts