Total Float Variance Between Current and Baseline Schedules
Forum TopicP3 had the ability to include a report column that provided the Total Float Variance between two schedules (typically the current update and its baseline). However, I've not been able to recreate this variance report in P6 v8.2. My intuitioin tells...