Any Problems anticipated inserting subproject into MSP 2010 (Enterprise)
Forum TopicI need to combine some sub project files into a single project using the insert sub project functions. Are there any problems that I can expect?
I need to combine some sub project files into a single project using the insert sub project functions. Are there any problems that I can expect?
Hi Perhaps this already exists on the forum somewhere but is anyone able to give me a step by step guide to carrying out windows/time slice analysis. Thanks in Advance John
Dear all, I am working in the planning department and i am required to make a planned and actaul percentage on a daily basis and required to draw the S curve for the same.The jobs invloved will be of different categories and is required to be complet...
Hi again!This time I have milestones that are showing under activities that start on the same date as the milestone. How do I get the milestones above these activities???Thanks,Grace
Dear friends Activity start date and prdecessor finish date are showing sameday even it is finish to start relation ..What to do to get the next day as start day in FS relationPlease help
Dear Sir Attached is a graph generated after loading the resource.I want to show the planned and cumulative(left and right ) in Nos instead of d.Is there any way to show the numbers on top each monthly bars as same like generating in the excel.......
My unit of measure is not working .. Please help
Guys, I'm a new Primavera user and whilst I've not had too many problems with most of the functions of it, there is one issue I can't fix and would be grateful if anyone could advise. We have an existing project of around 1000 activities, for each ac...
How "Performance % Complete" is computed in P6? What is the basis / formula? Thanks in advance. Regards
Hello All,Can Anyone tell me about the universities that are offering Distance learnign online Master Degree in Civil Engineering?
Hi, I am trying to find a way to display planned percent complete on WBS summary bars but cannot get it so show. The 'Percent Complete' is being calculated and shown and although all the tasks within my programme are showing their individual 'Planned...
At the links table I want to transfer the Preceding Activity Finish Date from activity table to a user defined field on links table, same goes for Succeding Activity Start Date. Is there a way to do this?Best regards,Rafael
Hi Guysmy % complete schedule and performance in my activity table varies from my % complete schedule and performancein my wbs chart view if i add the two mentioned %'s in die chart blocks why is this ? its using the same project and data ? im missin...
Hello Guys, Can any body please tell the difference between Resource Deependent & Task Dependent for an activity and how & where it affects the Schedule (i.e., at Original duration & at resource levelling)?
Hi All, I have a schedule prepared in MSP and I import it to P6 as an xml file. Durations of the tasks in the imported file appears in Original Duration column (as expected). However, when I change the duration of a task in the Original Duration in P...
Hi All, I have a schedule prepared in MSP and I import it to P6 as an xml file. Durations of the tasks in the imported file appears in Original Duration column (as expected). However, when I change the duration of a task in the Original Duration in P...
Dear All I have a problem with creating interproject relationships using excel P6 does not allow me to create them. Does any one has a work around? Thanks Luca
Does anybody know where I can lay my hands on reliable output reates for the production of design drawings by CAD Operators, ie, how long does it take a CAD Operator to produce a Satge D architectural drawing? Any pointers gratefully received. Andy
Hi guys deleted, figured out how to level with p6
Hi Guys,Here are six time saving tips in Primavera P6 Professional R8.1 http://bit.ly/pxO4fM If you know of some good tips, let me know and I can add them. Emily