Lag and Original Duration

L
Larry Cahn 👤 Member for 8 years 6 months

I need to have an excel spreadsheet that lists all activities original duraion as well as lags.

I've tried numerous was of P6 exporting to excel, filtering/formatting within P6 to copy and paste in excel, but am unable to find a way to get both the original durations and lags on one spreadsheet.

Does anyone have any ideas? Thanks!

Forum Sponsor

Top Posters

Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts

Problem on EPPM: Application Blocked by Java

Hello Colleagues,

I'm using P6 R8.2 Client-Server Based Version. I got a problem when I tried to use EPPM web based as shown in the picture below. This never happen before I updated version of internet browser and Java Application which I can't remember that what I used.

capture.png

Anyone had faced this problem before? How to solve it?

Thank you in advance.

Note: I used IE version 11 and Java version 8 update 201

Forum Sponsor

Top Posters

Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts

Forum Sponsor

Top Posters

Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts

Filter by a list of numbers

M
Mi Mo 👤 Member for 7 years 3 months

Hi everyone,

 

I haven't been able to find other posts about this, since I don't know how to call it what I am searching for..

The thing is this:

In my Primavera P6 I have different workorders. In Excel I have a nice list of 120 workorders that I want to change.

Now, I want to export exactly those workorders. Is there a way to copy and past that list in the filter of Primavera?

 

The only way I know how to get them is to filter one by one every workorder number.

Should be an easier way right?

Forum Sponsor

Top Posters

Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts

Project Codes

I have 3 projects and all have different Activity Codes for Systems.   I would like to use one common code to be able to group and sort on a layout with all 3 plans.   Can I create a set of codes in one of the projects and then move this to a global level to use with the other 2 project schedules. 

This should have been set up at the beginning but I got into this late. 

Forum Sponsor

Top Posters

Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts

Printing Gantt Chart

In print Preview on the 11X17 layout, I can see the data but no bars.   Am I missing something?  I have made a few adjustments but have not found the fix to have the bars show.  This is fresh out of the box P6.  Only started working with this version on a stand-alone.  

 

Looks like I found the problem and it is printing now with the Gantt chart 

 

Thanks for anyone that was thinking about the problem :>)

Forum Sponsor

Top Posters

Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts

Updating project plans

I am currently in the role of project controls.   I receive from our contractors a weekly update in the form of a file to upload into P6.   Once I have imported or uploaded the project plan I will ensure the milestones are connected and then produce a complete start to finish integrated plan.  Included is a commissioning schedule.  

Forum Sponsor

Top Posters

Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts

Publish Projects and Delete Published Data

J
Jon Davis 👤 Member for 10 years 8 months

Hi All,

Hopefully theres a P6 adminstrator out there can spot what I am doing wrong

As part of me rolling P6 out across the business I am creating web access logins for users to simply be able to view data but modify nothing.  I have succesfully acheived this but there are two functions they can still perform which I cant seem to disable in either the global or project security profiles.  These two functions are

1 - Publish Projects

2 - Delete Published Data

Forum Sponsor

Top Posters

Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts

Scheduling Problem

Hi Everyone,

I am facing an issue after scheduling (F9) in Primavera.

I am working on a Housing project ( Planning Phase) and i am applying milestones between activities.

When i schedule the project on current data date to give me a updated view of my schedule, all dates appear in my activites is same as data date.

Please help me out in this issue.

 

Thanks for your help

Forum Sponsor

Top Posters

Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts

Activity Not Sorting Inside WBS Node

Hello,

 I recently created a schedule and have it sorted by start date. I had to add a new activity with same start date and time as my first 2 activities and when I created the new activity it sorted it 3rd in sequence. I'd prefer to see this new activity 1st in the sequence but no matter what I do to the Activity ID or relationships to Start Milestones the newly created activity will only show 3rd in the sequence.

How can I make it so the new activity shows 1st in sequence order?

 

Thanks,

Forum Sponsor

Top Posters

Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts