Display activity codes description on each activity
Forum TopicHi, I'm wondering if it is possible to display the activity codes descriptions on each activity line rather than on the title of a group.
Hi, I'm wondering if it is possible to display the activity codes descriptions on each activity line rather than on the title of a group.
Hi,Appreciate if somebody could show me how to fill up the early start and late start date columns as data cannot be entered and on ly show display dates that are similar to START and FINISH dates. I need these info to construct my early start and la...
Hi,Appreciate if somebody could show me how to fill up the early start and late start date columns as data cannot be entered and on ly show display dates that are similar to START and FINISH dates. I need these info to construct my early start and la...
What is a closeout programme, Is there any difference between main baseline and closeout programme Thanks
Hi, after several days self-training on Primavera Risk Analysis, I still can't simulate the following sequence: -during an iteration, the activity duration is above its deterministic duration, pushing the succeeding milestone in delay. - in that cas...
Hi, Does somebody knows how to generate SDEF File and to convert to P6 XER File or vice versa. In addition, what is the advantage of using SDEF File since this is my first time I heard this SDEF File. Any help is very much appreciated.
I want to show my schedule from Primavera as Time-Distance-Diagram in TILOS. To get the data-exchange running it seems that you need to install P6 Integration API first?
Hi All, I'm trying to create a histogram that counts the number of Tasks at the instant in time that have a been alllocated with a cost centre value, rather unsuccessfully at the moment. Does anyone know how? Thanks, Chris.
Hi friends,Anybody pls reply what is the production rate for sructural steel work(light, heavy and medium).your help in this regard is highly appreciated.Regards,Sunil.
In P3, users could produce an Early, Late, & Planned Curve. P6 doesn't do this. I am able to produce an Early & Late Resource curve by copy/pasting the data from the resource assignments view into an excel spreadsheet, but I cannot produce a planne...
More details, my blog about 3D WBS: http://3d-wbs.blogspot.fr/
Question: How can we stop MP from automatically giving an activity a constraint after updating baseline?
Question: What is causing us to have to input six or seven times a remaining duration. Example: we want to show RD as 5 days, however, when we input, in comes up as 3.66. Then we put 5 days again and we get 3.97. This goes on until we finally get MP ...
Question: Which task duration type is the best to use Fixed Duration, Fixed Work, or Fixed Units when unlinking remaining duration and physical percent complete?
Hi Guys, New test results - Check out using the new Microsoft Project 2013 XML format in conjunction with Primavera P6 R8.2 http://ow.ly/cOOOe Emily
Hi Guys, New test results - Check out using the new Microsoft Project 2013 XML format in conjunction with Primavera P6 R8.2 http://ow.ly/cOOOe Emily
Dear All,I was assigned with a 50km long above ground pipeline installation project in saudi arabia. I had worked before in underground pipeline installation project. Although i know the basic wbs structure of above ground pipeline installation i don...
Hi Guys,I want to distribute particular resource throughout the duration of the Activity "A", but when I assigned the resource and generate the report it has been assigned whole resource to the start day of the activity only.But I created new project...
Morning, Pretty new to the concepts of planned completion date/completion date and terminal float, so pls bear with me. Should planned completion date and completion date be the same on an initial programme submitted for acceptance? Thanks.
Hi There, Does anyone have handy examples of methods to demonstrate Disruption. Such as the Measured Mile. Kind Regards Stephen