The power of norms to estimate maintenance activity duration (and why you shouldn’t live without them)

Estimating the time, duration and cost of the work order activity’s is something maintenance planners need to do every day.

The challenge is getting this right, and the cost of getting it wrong can be extremely high. At IAMTech we produce software called iPlan that allows standardization for consistent estimation and provide training courses to ensure that our customers gain maximum benefit.

Filed Under

The Conundrum of Three Point Estimation and PERT

Is an estimate based on multiple points more accurate than a single estimate?

If we go with conventional wisdom then it certainly would seem so. A mean of more than one estimate is likely to give us better result.

In project management, there is a three-point estimation technique. It calculates the expected duration based on three different estimates. It calculates the mean of three different estimates to determine the final estimate. This technique can also be used for estimating cost and resources.

Filed Under

Pick Your Battles Wisely

Conflict exists.  It is a natural part of being human.  It occurs at home and at work.

We disagree.  We have different perspectives and opinions.  We get upset by things that were said, or not said.  These events arouse our emotions.  We become angry or afraid.  

How to remove suffixes from dates and display both dates for milestones in Primavera P6

If you came into Primavera P6 from a Microsoft Project background, you would have noticed that actual dates have the suffix “A” appended to them, and constrained dates also have an asterisk appended. And milestones have a blank date field depending on the type of milestone.

In this YouTube video, I will show you a trick you can use to

How to create a Lookahead Filter in Microsoft Project

How would you like to create a rolling date lookahead filter in Microsoft Project instead of using the default Date Range filter? Users of Primavera P6 are used to defining the criteria for lookahead filters using Data Date or Current Date and we can also do same in Microsoft Project using Status Date or Current Date rather than pick hard dates all the time using the Date Range filter.

Filed Under