histogram for actual and planned manpower in P3
Forum Sponsor
Top Posters
Dimitrios Theocharidis
3 posts
MichaelFuelsC
0 posts
anwar zeb
1 posts
olva seselima
1 posts
Muhammd Muneer
0 posts
sairam
0 posts
MARAT BILYALOV
0 posts
RichTea66
0 posts
Muneer Muhammad
1 posts
Manny Onifade
5 posts
I did not get the answer from any one
but
i thought of one answer
Primavera can give values of current project planned progress and other on target one ,if we make target plan in such a way that the oll ather things remain same expect planned resources than we can enter actual value in the target plan ,
Be carful in updating the target and donot update resources , this method can give
planned histogram
actual target histogram
Hope you have pick it
Regards
Umer
Umar,
Did U get the solution for the above question..?
If yes plz forward me to [email protected]
Regards
Maask
Thank for Reply
Actually i want the report on primavera outlook format,i can generate report in excel but it looks fabricated ,Primavera reports give look a system generated report and people believe that it has not been fabricated (although it can be fabricated even in oulook form)
thanks for replying
Dear Umer,
You can get the planned manpower from resource loading. The actual manpower can be tracked daily based on site reports.