histogram for actual and planned manpower in P3

U
Umer Mehmood 👤 Member for 18 years 1 month

I did not get the answer from any one

but

i thought of one answer



Primavera can give values of current project planned progress and other on target one ,if we make target plan in such a way that the oll ather things remain same expect planned resources than we can enter actual value in the target plan ,

Be carful in updating the target and donot update resources , this method can give

planned histogram

actual target histogram



Hope you have pick it



Regards



Umer

U
Umer Mehmood 👤 Member for 18 years 1 month

Thank for Reply



Actually i want the report on primavera outlook format,i can generate report in excel but it looks fabricated ,Primavera reports give look a system generated report and people believe that it has not been fabricated (although it can be fabricated even in oulook form)



thanks for replying

M
Mohammed Mujtaba 👤 Member for 17 years 10 months

Dear Umer,



You can get the planned manpower from resource loading. The actual manpower can be tracked daily based on site reports.

Featured Partner

Top Posters

MR JUDE C ANYAEGBU
0 posts
GeoVe
0 posts
Ashkan Mohammadi
0 posts
Jeroen De Bauw
0 posts
Senior Planning Engineer
0 posts
Kristian Mcwilliams
1 posts
dagogo dan - jumbo
2 posts
Alex Lyaschenko
27 posts
James Williams
75 posts
xerxes
0 posts