PLANNING ENGINEER

Planning Engineer, Manazel Construction Company, Ashbeliah Housing Project (400 villas)

START Date
END Date
  1. Productivity Report and Monthly update of Actual man hours versus Budget Man-hours
  2. Preparing cash –flow chart and comparing expected expenditure against schedule income.
  3. Comparing actual cost report to the budget cost and projecting the cost at the end of the projects
  4. Total Budget report including direct and indirect cost, Labor, material, equipment and subcontractor.
  5. Material Coordinator & Follow up
  6. Workshop Drawing (Structural)
  7. Quantity Surveying

Planning Engineer, Saudi Tumpane Compant ltd, Shuaibah Independent Water Power Plant, Water Leakage detection Project In Riyadh City

START Date
END Date
  1. Responsible For The Development Of for construction, Schedule.
  2. Take The Lead In The Creation Of Work Breakdown Structures (WBS) And Development Of Schedules And Budget Data (Including Resource Loading) For Those WBS Elements.
    Analyzes Unit Rates To The Extent That The Estimate To Complete Unit Rates Is Well Understood And Defendable.
  3. Analyzes Schedule Progress And Performance And Identifies Developing Problem Areas.
    Assembles And Compiles Schedule And Cost Data And Inputs Into The Project Control Database And Provide Output To The Project Team.

Planning Engineer, Energy Technical Services, EPIC for oil free screw compressors and air dryers

START Date

To prepare master schedule.

To prepare progress reporting format.

To attend weekly meeting and update schedule.

To prepare recovery plans

To coordinate with clients and within departments in the company.

To prepare method statements.

Planning Engineer, Arab Korean General Contracting, Al Faya Roads & Infrastructure

START Date

Role: Planning Engineer

 

•             Contractor's work programs development  & submissions.

•             Record and report the actual progress of the work versus the planned work.

Planning Engineer, Al Jaber Group, Infrastructure works- Emirati Housing Community Phase-1, Infrastructure works-Al Ain Industrial City, Shuttle Bus Link Road- Yas Island, Yas Island Infrastructure Development

START Date
END Date
Experience Hours (Planning & Scheduling)
6900

 

·         Managing Early Warnings and claims with respect to time and cost.

·         Setting up Sustained management of dedicated control of progress profiles updated CAD files, Contractors look ahead programmes.

·         Develop Master programme in Primavera P5 and P6 using EPS and WBS structure to meet project control criteria.