PLANNING ENGINEER

Planning engineer, DEGREMONT, 3 sewage water plants

START Date
END Date

 

Construction of the time schedule for three sewage treatment plants:

 

  • Planning & scheduling of the engineering, procurement and construction phases;
  • Methods and procedures to measure the progress;
  • Weekly and monthly reports;
  • Training of an engineer for the mission.

Planning engineer, BOUYGUES Travaux publics, Motorway and metroline

START Date
END Date

Planning engineer. Construction of the time schedules of a motorway in Slovaquia and of a metroline in Dublin:

- Elaboration of the WBS of the projects, in interaction with the partners;

- Construction of the time schedules, Gantt & trip diagrams, with durations descriptions;

- Serverals travels in Slovaquia.

PLANNING ENGINEER, Thiess Industrial Projects, Wandoan Coal Handling & Preparation Plant - Wandoan Coal Project

START Date
END Date
Experience Hours (Planning & Scheduling)
500
  • Prepare resource & cost loaded loaded schedules for Process Plants in Coal Handling Sector
  • Effectively gather construction progress activity to provide advice and feedback to construction personnel on their work area activities monitored against the Construction Program.
  • Interface with construction personnel providing feedback on progress impacts on the Construction Program.
  • Interface with construction personnel on productivity.
  • Continual maintenance of the Construction Program through analysis of construction activity data and effective update

Planning Engineer , SIG Construction & Industrial Corporation , San Pablo City Local Water Utilities Project.

START Date
END Date

Preparation of baseline programs and as-built program, Preparation and issue of necessary reports (daily, weekly, monthly) to Head Office and/or Client. Preparation and monitor of materials and major procurement of the project. Site supervision and coordination with owner’s representative.

Planning Engineer, McDermott (Scotland) Limited, Piper Bravo Redevelopment Wellhead and Drilling Module

START Date
END Date

PIPEMILL PRODUCTION / PLANNING ENGINEER

Responsible to Lead Pipemill Engineer, as part of a Production Team, for 2 Pipemills and Pilerack Fabrication Facilities, and to provide all relevant information from client drawings and specifications necessary to carry out Tubular Assembly for use in the fabrication of offshore oil and gas structures.  Many of these activities are subject to the pressure of providing the most economic method and sequencing of events, which were normally subject to tight time schedules.

 

PLANNING ENGINEER

Responsible to the

Planning Engineer, Coflexip Stena Offshore Limited , Various Subsea Diving and Construction Projects

START Date
END Date

 

Duties included the development of detailed planning packages in order to meet, both in-house partner and client specific requirements, liaison with TAP Partner and Client planning personnel, monitoring and reporting progress against the accepted planning package at agreed intervals, and revising the detailed planning package as directed by the TAP Project Manager. 

Responsible to Planning Manager for providing detailed planning requirements for assigned projects or tenders and to establish acceptance of these by the client.  This involved working in close c

PLANNING ENGINEER, Barmac, PSL, Total Fina Elf, Elf Elgin-Franklin PUQ Platform Onshore Fabrication and Offshore Hook-up

START Date
END Date

Working on the Elf Elgin-Franklin PUQ Platform during the onshore construction phase at the BARMAC Nigg facility.  Reporting to ITS Project Manager and responsible for the scheduling of manpower and testing work scope in accordance with the construction and commissioning programmes. 

Moving onto the hook-up based offshore, commissioning and post start-up phases.  Additional offshore roles included liaising with beach support, co-ordinating personnel change outs and work rotas, up mans and down mans, POB monitoring and logistics.  Responsible for the update and ad

PLANNING ENGINEER, Construction Services LLC, Oil & Gas Projects; Buildings & Infrastructure Projects

M
Mufiz Sayed 👤 Member for 17 years 8 months
START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
1000

CONSTRUCTION SERVICES LLC.,Oman                                                                             

PLANNING ENGINEER, Al Hubra Trading & Contracting LLC, Project Planning & Expediting

M
Mufiz Sayed 👤 Member for 17 years 8 months
START Date
END Date
Experience Hours (Planning & Scheduling)
1000
Experience Hours (Cost Management)
950

Al-HUBRA TRADING & CONTRACTING LLC.,Oman