Project management
What the difference b/w project baseline, primary, secondry & tertiary baseline programme ?
- Read more about Project management
- 6 comments
- Log in or register to post comments
General planning comments and questions.
What the difference b/w project baseline, primary, secondry & tertiary baseline programme ?
Hi,
In this particular case, P6.8 is not importing any of the relationships between the activities, although the import specs are checked to import them. The projects are being exported from 6.2 version. I will appreciate if someone could guide how to resolve this issue.
Best Regards
Meraj
Hi all,
I'm using Vico Control 2009 demo mode and I would like to know if it is possible to put multiple crews in a particular activity.
Grateful.
I have just had a programme accepted by PM but it is qualified with various wording, one being that a certain activity should link to planned Completion (I should mention that the PM has instructed that works not affecting the opening of the scheme can be de-linked from Planned Completion and completed after - i.e fencing / not convinced he is entitled to do this but we have gone with it as we still get same pre lims).
my problem is that a new Cl32 has been accepted but he says accepted with a load of qualifications, when really he should have just rejected it stating
Hi,
Im looking at conducting earned value without any sort of formal company proceedure and i thought i would get your opinions?
We have some activities in our schedule that will be actualised even though the work has not been fully completed. This is because it is a rail project and the possessions which have define starts and finishes have to end then (to hand the track back).
Hello
Just a quick Question regarding baselining my project.
When I schedule my project and then I baseline it with that data date.
If I then update the project plan and schedule it with a new data date and baseline it again is it possible to go back to the previous baseline to see the original plan instead of clicking on Undo if things don't go correct after I schedule & resource level.
Thanks
Rhys
please help me how to use lag.how to see it
Hi
Does anyone know how to display the critical path as a default setting
Other software i have used shows the CP as a default
I have used the Chart Wizard to display the CP but was wondering if there was a better way
Any ideas welcome
Thanks
Regards
Alan
Does anybody know where I can lay my hands on reliable output reates for the production of design drawings by CAD Operators, ie, how long does it take a CAD Operator to produce a Satge D architectural drawing?
Any pointers gratefully received.
Andy
Dear all,
I am working in the planning department and i am required to make a planned and actaul percentage on a daily basis and required to draw the S curve for the same.The jobs invloved will be of different categories and is required to be completed in a dparticlular time span.How do i dwvolop the same.Is it better to use excel for the same.
Regards
Sunil.k