Planned Vs Actual

A
AB Timo 👤 Member for 15 years

Hello All,

if you have Planned a project and after starting updating it,you find that you have entered a couple of activities that are not happening actually and Need to be deleted.What do you do??

Will you have to make another schedule?? Because if you delete those extra activities then your baseline will be disturbed and it will ultimately disturb the Logic.

Please give you opinion.

Best Regards,

Faiz

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

PROGRAMME ACCEPTANCE

B
BRAVE G 👤 Member for 15 years 7 months

HI, ALL

 

I  am very greatfull  to all of you who have supported me throughout this very challenging period. It my first time working as a lone planner. And the client wants 100% allignment to NEC3. 

I have made changes where necessary but they still finding error.  I have implemented the Time Risk Allowance and have shown floats as complied with NEC3.

 

The problem now is that the client is saying i should take out all the PMIS (project management instructions) and insert (EWNS) EARLY WARNINGS SIGNALS.

 

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Urgent Repsonse

Hi all ,

 

I just created a Baseline , submitted to my client ... which he did replied with comment ... One of the comment sounds confusing to me.. SAT which order wise is know as Materials delivery at site was place under the Procuremnt WBS in my Schdule , But my Client feels otherwise ...

Please find below the comments

* Why is SAT ( Site Acceptanc Test ) a sub heading under Procuremnet WBS , SAT should be shown under construction Phrase *

 

You accelerated Responds will be of great Important ... 

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Critical Path Question

A
AB Timo 👤 Member for 15 years

Hello All,

If we have a group of activities that are not shown in critical path,is there a technique to bring them in the Critical path.

What My Experience so far is that primavera chooses the critical path itself when you schedule your plan.But if after schedulling you find that the critical path shown is not what you wanted and some activities are not highlighted as critical then what to do.

Please keep in mind both options i.e,

1.Critical Path When Total Float is=0

2.Select longest path as critical path.

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Mandatory Finish Constraint

I would like to receive feedback from the experts in regards the following question:

Is it proper to put mandatory finish constraint on the end of contract date (Milestone)?

In my view, the date will not change if you put a constraint on it unless the date go past the data date.

Thanks

Edwin

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Finish Milestone

A
AB Timo 👤 Member for 15 years

Hello All,

I have Planned a Project and after Finalizing the Schedule I've just Noticed that the Finish milestone is Note Giving the Required Date.My Project will Be Handed Over On 15th Dec,2012 and I gave FF RElationship to Finish  milestone and last activity of the Project (Site Clearance-->FF-->Finish Milestone),But  Instead of Showing 15, Dec 2012 as the Complition Date, the Finish Milestone is taking One day more i.e, 16th Dec 2012.I have not given any lag and have asigned FF Relationship also.Can anyone tell me the reason??

 

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Filtering By Responsible manager

A
AB Timo 👤 Member for 15 years

Hello All,

I have been working on a Plan for Railway Track Construction and There are Separate Resposible managers for Each WBS.I want to Filter my Plan so that i give Each Responsible manger a list of activities that he is Responsible for.For this I Created a filter by Responsibly manager and applied it,the Issue is that,

* My Plan is filtered by that responsible manager but at the same time Other WBS Headings are Still Present in the activity table (Only WBS Name Not ts Activities). I want to Show the Required activities and WBS Name only.

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts