Planning, Scheduling & Programming Discussion

Description

General planning comments and questions.

Container
No

concrete tracking reports

I am working in a project contains 3 main concrete buildings A & B & C  each has its total concrete Quantity, i was asked to produce a report showning the excuted Quantities vs  Planned Quantities and showning remaining Quantities, also showning the productivity required to maintain finish date for each building an over come the delay , my question is what should the report contain and if there is any form for these reports, thnxx

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

E&M / Building Services Production Rate

I need the assistance of E&M Planning Engineers about the Building Services Production Rate in Underground Station Works as:

1. Ducting Installation - linear meter / day

2. Fire Sprinkler Pipe Installation - linear meter / day

3. Cold Water Pipe Installation - linear meter / day

4. Electrical Conduit Installation - linear meter / day

5. Electrical Cable Tray Installation - linear meter / day

Thank you very much for those who will respond to my request!

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

How To Making Schedule Power Plant 2 x 300 MW Thermal Power Plant

Hello master Planner, I'm raden from Indonesia..

I need help.. Does any body have experience to making Schedule of thermal power plant using MS Project..

Kindly mail to use private message service..

thanks a lot..

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

How to Change Y axis in Primavera Histogram

F
Faz Masood 👤 Member for 13 years 10 months

Hi Every one I need help I build a schedule assing budgeted man-hours and resource. How Can I show no of mens required iI put the time interval 50 hrs per week as we are working 50hr a week my time scale is in week but didnt work out it shows hours on the y-Axis. I need Help i wana s show no of guys.

Thanks

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

How to Rearrange Activity ID's in an Ascending Order in Primavera P6 V6,

its like im having an existing schedule then ive decided to add more activities and rearrange the sequence...unfortunately the Acitivity IDs were no longer arrange in an ascending order, since i already change the sequence, how can i rearrange them in an ascending order again? lets say ive got a total of less than 1500 activities.

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts