Assigning Critical Path Manually !

H
Hany Edrees 👤 Member for 17 years 8 months

Hi everybody .. Is it OK to choose certain activities and make them critical instead of just relying on P6 critical path calculation using total float or longest path? Why we should do this? and finally what is the best teqnique to do so? 

Thanks in advance

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Cost overrun

M
Mona Singh 👤 Member for 13 years 1 month

Dear All

 

I am working on a project which started 2012 & finish date is 2019, Mining project. I prepared the project & got all cost variance as per planned & actual with delay analysis. Now we need to find the [strong]cost overrun [/strong]compare with the project report (DPR) which given by one of our consultant 2 yrs back. How to do ??

should I prepare activity wise consultant report in P6 then running Claim digger ??

* using P6 8.3 EPPM

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Activity % Complete in Totals and Sub-totals do not appear

A
arvin pura 👤 Member for 12 years 3 months

Hi Planning Experts,

Currently I am updating my programme in P6. My programme is resource loaded with manpower and material. In updating I am using Activity % complete in the column and physical % as the percent type. But after updating there I cannot see the % complete in the total and subtotals (or wbs bars). Need help and advise.

 

Thank you.

Arvin

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Project Suspend Activity

Hi to All,

I need help, Im using P6 ver 8.2.  Ive read some of the forums regarding using the calendar, its advantages and disadvatanges on this problem.

Heres the situation, Project operation was suspended for 60 days due to a Tower Crane Collapse.

Questions:

1.  Whats the best way to present it to the client besides using the Calendar and marking those dates NON-WORK, Bar-necking and using a Curtain.

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

CCE or RMP ?

H
Hossein lak 👤 Member for 18 years 5 months

Dear All

I'm PMP certified,also have about 8 years experience in field of oil and gas poject planning and control.

Now, I want to  find the work abroad (I am in Iran), But I did not recognize my experience (+) PMP are enough to find a job? Or Not, I have to get CCE, RMP or other international cerification.

Could any one give me a hand?

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Interactive PMBOK® Glossary Terms and Definitions

J
Jack Black 👤 Member for 22 years 1 month

It's FREE!  Within this database you will find all 534 project management terms and definitions located in the Project Management Body Of Knowledge® Glossary (Fifth Edition 2013).  If you are studying for the PMP® exam, you can use this site like flashcards to help you memorize the definitions.  Find the PMBOK Glossary of Terms and Definitions here:    http://www.pmconnection.com/modules.php?name=Encyclopedia&op=list_content&eid=4

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts