E&M / Building Services Production Rate

I need the assistance of E&M Planning Engineers about the Building Services Production Rate in Underground Station Works as:

1. Ducting Installation - linear meter / day

2. Fire Sprinkler Pipe Installation - linear meter / day

3. Cold Water Pipe Installation - linear meter / day

4. Electrical Conduit Installation - linear meter / day

5. Electrical Cable Tray Installation - linear meter / day

Thank you very much for those who will respond to my request!