Oracle Primavera - PM6

Description

Here's a place to discuss some Primavera Enterprise questions

Container
No

Longest path in under specific WBS

R
rauf kensuk 👤 Member for 6 years 5 months

Hi All, I am working with 20 different construction under one P6 Program. Example WBS as below;  

 1. Facility Construction

1.1. Block A

1.2. Block B

1.3. Block C and goes on. they are not connected to each other. their only intersection is project start finish activity   

I am trying to find the longest path for specific Block. what I mean is filtering longest Path in "Block A".   

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Good News for all Primavera SDK Magic Tool Users

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Large Activity Filter

Hi All you Brainiacs!

 

Have any of you found a way to autocreate a large filter? I have about 75 Materials Delivery milestones and I want to show their Successor/s

 

So my filter terms would be:

Where Predecessor = (insert Milestone id)

or

Where Predecessor = (insert Milestone id)

etc,etc,etc. for the whole 75 Milestones.

 

Thanks,

 

Rod

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Primavera - compareing a positive schedule to a negative.

J
John Reeves 👤 Member for 13 years 1 month

Best way to handle the following:  Target (same month) has negative float.  Revision of same month has no negative float (recovery schedule) -  I don't think I can show Target Float, also the Targ. Start and Finish are goofy - I assume that is because they are negative?  -  Seems odd can only pull 1 set of dates.  In P6 16.1 is this a problem they later solved?   Have later versions Added more columns? I think the best way to resolve this is to compare from the Neg. Float version to the non-neg. version.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

What would cause P6 to NOT use the default units/time when assigning a resources?

A
Alex Garcia 👤 Member for 9 years 8 months

When assigning resources, P6 isn't using the default units/time to populate the budgeted units.  For example, our resources are set to 8h/day.  So, when we assign a resource to an 8 day activity, the default budgeted units should be 64h, with 8h/day.  But, it's loading 264h @ 33h/day.  What would drive this, and how can it be fixed?

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Event Code: CNFFZ\-0464-A (Could not find \bin\java.exe)

Hi,

I have currently been trying to import Microsoft Project XML Programmes into Primavera P6 Professional R16.2. Every Time i attempt to this, i get a EInOutError with the event code CNFF\-0464-A and the description 'Could not find file\bin\java.exe

Would anyone be able to assist with this and help me be able to import XML files to P6.

Any Help Would Be Much Appreciated,

Thanks,

Jordan 

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Event Code: CNFFZ\-0464-A (Could not find \bin\java.exe)

Hi,

I have currently been trying to import Microsoft Project XML Programmes into Primavera P6 Professional R16.2. Every Time i attempt to this, i get a EInOutError with the event code CNFF\-0464-A and the description 'Could not find file\bin\java.exe

Would anyone be able to assist with this and help me be able to import XML files to P6.

Any Help Would Be Much Appreciated,

Thanks,

Jordan 

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts