Hi All,
I have created some Activity Codes to be assigned for accounting purposes. The first stage was easy as there were only 8 groups and maybe 5 or 6 codes within each group.
Sample: Code Value Description
2 Tailings/BPF Area 2.1 C-12394-01-02-05-07 2.2 C-12394-01-02-05-06 2.3 C-12394-01-02-04-04 2.4 C-12394-01-02-05-07 2.5 C-12394-01-02-05-07 2.6 C-12394-01-02-06-03 2.7 C-12394-01-02-04-06 but now the request is to expand the listing and groupings to an additional level as below:2 2Tailings/BPF Area2.1C-12394-01-02-05-062.1Bulk Earthworks BPF area2.1C-12394-01-02-05-062.1.1Bulk excavation of BPF pad & roads areas to subgrade - spoil to material to Water treatment plant area (Subject to remeasure against actual)2.1C-12394-01-02-05-062.1.2Excavate and trim Drain A2.1C-12394-01-02-05-062.1.3Excavate and trim Drain B2.1C-12394-01-02-05-062.1.4Supply, Place, Compact and trim pavement to BPF Pad & roads2.1C-12394-01-02-05-062.1.5Supply & Installation of culverts & head walls to Drain A & B2.1C-12394-01-02-05-062.1.6Supply, place geofabrics & rock works to Drain A & Drain B outlets2.1C-12394-01-02-05-062.1.7Supply and installation drain A Gabion wall2.1C-12394-01-02-05-062.1.8Form road side safety bunds2.1C-12394-01-02-05-062.1.9Excavate, form and pour concrete spoon drain2.1C-12394-01-02-05-062.1.10Drainage bund at CV10972.1C-12394-01-02-05-062.1.11Supply and Installation of conduit services (Subject to remeasure against actual)
How can I upload the codes spreadsheet?
Thanks,
Rod