Best way to handle the following: Target (same month) has negative float. Revision of same month has no negative float (recovery schedule) - I don't think I can show Target Float, also the Targ. Start and Finish are goofy - I assume that is because they are negative? - Seems odd can only pull 1 set of dates. In P6 16.1 is this a problem they later solved? Have later versions Added more columns? I think the best way to resolve this is to compare from the Neg. Float version to the non-neg. version.
Primavera - compareing a positive schedule to a negative.
Forum Sponsor
Top Posters
Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts
why not use a variance column ?