Search

Default units/time change while importing

Forum Topic

Dear Firends,We are working in Oil & Gas EPC Project in the Middle East.We are facing a strange problem(!) with Primavera 6.0 Release 7.0.0.When we imported a project it shows defaults units/time as 1/d for all labor resources. But when when the same...

Sep 15, 2011

Default units/time change while importing

Forum Topic

Dear Firends,We are working in Oil & Gas EPC Project in the Middle East.We are facing a strange problem(!) with Primavera 6.0 Release 7.0.0.When we imported a project it shows defaults units/time as 1/d for all labor resources. But when when the same...

Sep 15, 2011

does anyone have an idea about CNFF\-3348-2 error?

Forum Topic

Hi all,Previously, I have created a forum topic related to this issue but unfortunately I could not get any satisfactory answers. That's why I felt like consulting to the forum once more.When I try to import a XML file created by MSP to P6, I get thi...

Sep 15, 2011

MSP 2010 - User-Controlled Scheduling

Forum Topic

Dear fellow PP members,With the introduction of MSP 2010, Microsoft came up with a new feature called “User-Controlled Scheduling”.Since this name suggests that -until now- users had no control over a MSP schedule whatsoever, I immediately started to...

Sep 15, 2011

Shutdown schedule MS Project

Forum Topic

Hi all, I am looking to network with other Shutdown Planners/Schedulers working on Gas Production Plants

Sep 16, 2011

P6, Resources duplicated during import

Forum Topic

Hi All,I am facing problem while importing XER. While importing XER, by selecting "Update Existing Project" with "Default Import Configuration", some labour resources are assigned twice to activities.Can anyone please help to solve this issue....Than...

Sep 16, 2011

Where are the Moderators

Forum Topic

Good Morning Gary Whitehead and I are the only moderators actively working on the planet. Where are the rest of you guys? Regards Mike T.

Sep 16, 2011

Urgent, Continuous Programme Refusal......

Forum Topic

The programme has been refused several times refering to clause  and 31.2 31.3 and 32.1 respectively.. HAs anyone been in this kind of situation where the issued programme is continuously not accepted.... Any IDEASSSSSSSSSSSSSSSSSSSSSS

Sep 16, 2011

Gantt chart showing ERP system implementation project

Forum Topic

I realy need a "Gantt chart showing ERP system implementation project by ASAP methodology", Is there anyone can share a MSP file, in this field?I need some information about A-SAP implementation steps such as WBS, Time scheduling, activity relationsh...

Sep 16, 2011

Resource Type related

Forum Topic

Dear Friends,When I received the .xer file from my subcon, some of the 'non-labour' resources as assigned as 'material'. When we tried to change this, the program doesn't allow to change cautioning that this may affect other project which the resourc...

Sep 17, 2011

Critical Path Change

Forum Topic

Hello All,I have just come accross an issue that i never faced before.I have Planned a project and after finalizing the baseline when I updated it on the current data date,The critical path has transfered to Non.Critical.Now there is no critical acti...

Sep 17, 2011

What constrainst in p3?

Forum Topic

 Hi, the project finish date is almost 2 years delayed, which constraint shall I use in P3? The data date after I put the constrainst will be the project start date. When I use the mandatory constrainst, the total float will be zero for that activity...

Sep 18, 2011

What constrainst in p3?

Forum Topic

Hi, the project finish date is almost 2 years delayed, which constraint shall I use in P3? The data date after I put the constrainst will be the project start date. When I use the mandatory constrainst, the total float will be zero for that activity ...

Sep 18, 2011

resource smoothening

Forum Topic

Hi friends,Anybody please explain defference between resource smoothening and resource levellingRegards.Sunil

Sep 18, 2011

Claim analysis

Forum Topic

Hi friends,Anybody explain the most important things to be considered while doing the claim analysis.RegardsSunil

Sep 18, 2011

registration folder

Forum Topic

Hi folkswhat is the registration folder of the project in primavera 6.thanks

Sep 18, 2011

Project Planner Cape Town

Forum Topic

I am looking for a Planning Engineer based in Cape Town, below are details. Project: Mining Construction Duration: Immediate ~ 2015 Assignment : Office (till Dec 2011) & Site (till End of Project) Full Time Perm/Contract possible. Requirements : Min....

Sep 19, 2011

Advanced Project Management In Primaver P6

Forum Topic

Hi,Can someone tell me about any website from where I should download lectures for Advanced Project Management In Primavera P6.If not then how to buy this complete course????..I have been searching for many days buut have not found satisfactory resul...

Sep 19, 2011

Christmas Freeze in MS Project 2003

Forum Topic

I have added a Christmas freeze to my Plan from 19/12 - 01/01 in "Change Working Time" by entering them as exception days (non-working). This has been saved but it hasnt pushed out any of the task dates that were due to fall in the freeze period to a...

Sep 20, 2011