Planned&Actual %complete

Forum Topic

Dear All Planners,   I know the Actual % Complete in P6 = Physical % complete... But what I don't know how we can calculculate the Planned % complete for the same schedule? What is the procedure.. Thank you for any help..   Hanson

May 1, 2012

Problems assigning specific calendar to only a few tasks?

Forum Topic

Hello!I am trying to assign a 7 day week calendar to 2 tasks on my project. The remaining 100 or so are the standard 5-day 8 hour calendar. However when I drag the '7 day week, Bank Hols & Xmas' to the tasks and release it all of the other tasks chan...

May 1, 2012

Baseline Labour Units

Forum Topic

Gents I have been using a backup of the project as the baseline but found a problem.  The baseline has changed after 8 months of work being completed and tasks and durations changing. This would be considered a re-baselining of the project.     If I ...

May 1, 2012

Scheduled Cost Value

Forum Topic

Hi everybody, How can I gain scheduled cost value for an activity (for example in a column in activity table view), if I have assigened resource curve to activity   Thanks

May 2, 2012

Link task to other projects

Forum Topic

Dears,How can i link tasks between projects on MS Project 2010 Prefessional. I mean, how can i link on "Project A" that 1.2.1 task of "Project A" should start 5 days after 2.2.3 task of "Project B". or do i wish impossible thing ;)Anyone know about t...

May 2, 2012

Planned Start

Forum Topic

I would like to know how to switch on Planned Start and Planned finish date when baselining the projects.

May 3, 2012

MS Project & Sharepoint

Forum Topic

We have multiple project listings (from Sharepoint), spreadsheets and project plans that we are trying to combine into a master project plan. Realizing that SQL Server and data mapping might be required, does anyone have an idea how we can reduce the...

May 3, 2012

Whats Cost % Complete?

Forum Topic

Dear All Planners,I just need to know what is the equation P6 use to calculate the Cost % Complete? Thank you,

May 3, 2012

Whats Cost % Complete?

Forum Topic

Dear All Planners,I just need to know what is the equation P6 use to calculate the Cost % Complete? Thank you,

May 3, 2012

Constructive [overtime] acceleration - Opinions?

Forum Topic

Hi All A topic im sure has been discussed many times before but as new judgments are provided in court and the industry evoles maybe opinions/outlooks change. In terms of constructive accleration such as performing overtime without an official reques...

May 3, 2012

Use of Steps

Forum Topic

All  I have inherited a project where the tasks are very high level.  I have a number of pipes listed under one task and I know the number of metres or feet to be installed in each.   This is relatable to a budget labour unit so I have: pipe 101 - 10...

May 3, 2012

Relationships and the Critical Path. Confused

Forum Topic

Hello!I am new to planning (6 weeks). It is my first job in the construction industry also.I have been taken on as a planning engineer for a small-medium sized main contractor in the UK. I am the only planner currently and I have taken over from an e...

May 4, 2012

Schedule submission

Forum Topic

TFIF everyone! :-) Quick one for those of you with both hats on....... For those of you working for a 'client' do you insist / stipulate that the contractor submit the schedule source files, be it .xer, mpp etc.. at the reporting period?Is this puere...

May 4, 2012

closing out schedule

Forum Topic

Hi friends,what should be thre primary concerns when we are making a closing out schedule for an industrial project.Your views are most welcome.RegardsSunil

May 4, 2012

Multiple resources in P6

Forum Topic

Hi, I'm looking for some help with resourcing in P6 v5 please. We have one activity with multiple resources stretching over a perdio of 10 working days.  I'd like to schedule one resource so he/she works 2 full days at the start of the activity and 3...

May 6, 2012