what is an interface?
Forum Topichttp://3d-wbs.blogspot.fr/2013/04/part-84-what-is-interface.htmlBR, JYM.
http://3d-wbs.blogspot.fr/2013/04/part-84-what-is-interface.htmlBR, JYM.
Hi all,Does anyone know how to / if you can refer to an answer of a formula in part of another formula?If you can, could you please explain how?Kind Regards, Chris
Hello Everybody,Hope all are doing good.I am facing a problem while importing the file in P6 from MSP 2007.It is showing the MSP file is not supporting the files into ODBC,MDB,MPD and the save the file that supports by Project.So, in this instant wha...
Dear All,I would like to ask if somebody could send me a copy of hospital building schedule.It is my first time to do hospital project and I need some reference.Please send to my email [email protected] help is very much appreciated.Thanks and reg...
Hi,I was wondering if anyine can help with the Lecturer Daily Rate i'm expected to pay a trainer in USD, is ther a norm or a standard! preferably in the UAE? Cheers
Any one to help me resolve this problem in P6. 1. How to make back up files in P6 in oracle data base with out any exporting. 2. How to locate the specific Project in Oracle data base. 3. How to Maximized the memory space of P6 data base.
Primavera P6 V2 I have been having some issues recently in P6 where the software is remembering old dates and using these old dates to drive successors rather than the correct logic being the driver. Basically I have some milestones linked to activit...
Hi All,Following my last post (http://www.planningplanet.com/forums/asta-powerproject/537680/using-formula-answer-another-formula). I’ve realised I need help with the actual formula;I have a programme with multiple tasks per line / bar, with each tas...
There is much misconception about the use and interpretation of the S-curves. I find the AACE International Recommended Practice No. 55R-09 is an incomplete document regarding S-Curve Analysis. It worries me that this document is promoting erroneous ...
all,i want to arrange a proposal schedule by project 2007.but i could not find how to modify the time scale like p6, from 1 2 3 ....... not from the actual date.thanks !
Hi there,I'm new in both in this forum and also in planning. I'm doing my masters thesis in Schedule Delay Analysis. I'm in dire need of a case study for delay analysis that consist of as-planned as well as as-built schedules and also all the records...
Hello all I am trying to print a programme, which has been grouped & sorted as per WBS. The row heights have been set to 35, to accommodate the long task descriptions. The bars have been set to display at row 1. I am also using a page break at each ...
My conection to the database got bad. The user is pubuser, the database is PMDB, the password is not shown ***** and the Public Group ID is 1. The admin here says he does not know what to do, he says he installed it staight and it worked fone for me ...
Asta have just introduced a new training workshop in conjunction with BIM Academy and Northumbria University. This 2 day course will give an insight nto ways of BIM working and help you develop an understanding of how to use BIM tools for optimising ...
Hi GuyCan any of you help me out? I am new to Primavera. When i submitted one of my project program to the Consultant, he asked me to show the critical path in the same programme. How can i show the critical path? Thanks
New to scheduling, hoping for some help with baselines!I've stepped in as a scheduler mid-way through a project. The schedule I inherited has about 10 work packages included with more coming down the line. A baseline was applied to the original sched...
Dear all,I have a question regarding diagram.I can see, that if I get a project file with diagram, I am unable to reverse engineer all parameters to see what the diagram is all about.Specifically it is not possible to see, what Actions have been sele...
Hi All, 1.Is it possible to make sub projects froms a parent project for using seperately 2.if it possible can i export it in format ather than excel For example i have a big project project-1,i want to divide this project in to two, for two sub cont...
Planners,Appreciate very much to share the reasons why is not acceptable to have a P6 schedule which contains activities progressed beyond data date from Planning & P6 perspective?Thanks a lot in advance.