Search

Team Usage - EPPM

Forum Topic

Hi There,Currently using EPPM vs19When viewing the resources at  'Team Usuage' the chart defaults to Two years (Q3 2021 to Q2 2023)?Current project im working on has duration of 5years, looking to download team usage for this time.When viewing the sa...

May 19, 2021

Import the BOQ with its prices to Primavera directly. (It’s free)

Forum Topic

This video illustrates step by step how you can use the BOQ Magic Tool to: It can export the BOQ with its prices to Primavera directly.It can facilitate the task of listing the activities of the schedule.You can modify the descriptions and prices bef...

May 24, 2021

WBS schedule % is not showing

Forum Topic

Hi everyonemy problem is simply: I have created a project & added the resources with labor/nonlabor units without cost as per client standardhowever when started updating porgress, I notice that only the activities is shoawing the schedule % & the wb...

May 25, 2021

Should an accepted programme be updated before evaluating an EOT

Forum Topic

I am currently in discussion with my ECCPM regarding an EOT claim. He has issued an instruction that was a few days before a monthly submission. The previous month programme was already accepted. To establish the EOT claim I used the previous month p...

May 25, 2021

Extracting Data from a Hosted System

Forum Topic

I am currently working on a commission which utilises a hosting service, the system is very well setup by the host provider through their cloud based desktop. What this does mean is we cannot extract data without paying the hoster for retrieval and c...

May 28, 2021

Microsoft Project 2016:Convert or save a baseline into another

Forum Topic

Hi All,I have a project where all the 11 baseline allowed in MSP has been used, the problem is the "Baseline" is the last image of the schedule that the scheudler saved before the last update. "Baseline1" is March end and "baseline2" is February end,...

Jun 1, 2021

Copy Activities between projects having different WBS

Forum Topic

Hello,Currently trying to update a master baseline draft, I'm trying to update and add some activities to the MS from another project, but both have different WBSs. Is there a solution or I'll have to manually update? Thanks.

Jun 4, 2021

Cost Control - Samples

Forum Topic

Hello All, Can anyone in this goup forward me a Cost Control Table, Excel Files etc. I am in Oil&Gas Sector and into cost control too. So would like to know if it meets the experts format. My Email ID - [email protected] ThanksJithin

Jun 7, 2021

PG / MASters for a Project Control Engineer

Forum Topic

Hello All, Please recommenda PG/Master course for a Project Control Engineer. I have a Bacjhelors in Engineering and my career is in Project Control, I would like to do a Masters now. So please advice. Warm RegardsJithin

Jun 13, 2021

Primavera P6 - Interface Problem ("Add Resource")

Forum Topic

Hi there. I have problem by openning "Add Resouce" window. When I click it, no action there. No window opens. As a result, I can delete the resource, but can't add it. Therefore, I use only excel to assign resource. Does anyone have such a strange ex...

Jun 14, 2021

Stucked pending Jobs - Primavera P6 Professional 18

Forum Topic

Hello dear friends!All clients of Primavera P6 Professional 18 have problem of pending jobs. Copy project processes we are using all are waiiting in the list of Pending jobs.I tried to search but i could not find fresh solution for this.

Jun 15, 2021

Early & Late "banana curve"

Forum Topic

Hi - I'm looking to produce banana curves (early and late date envelope) as part of the project controls suite of metrics using Powerproject. I used to produce these in P6 using activity count resource in the Resource Assignment spreadsheet window an...

Jun 16, 2021

User Already Logged in error

Forum Topic

I am getting the error "User already logged in"  I have searched this topic and tried several of the fixes with no results.  Im using Version 15.2 and SQLlite.  

Jun 16, 2021

Physical % complete for milestone date

Forum Topic

Hi PlannersI am updating a schedule and the first activity is start milestone, when I enter the actual start date, the percentage complete does not change to 100% and I tried to fill it manually but it does not work. It works for other activities. Re...

Jun 18, 2021

primavera activity predecessor

Forum Topic

Sir/s: I am new in Scheduling.I started to learn Primavera but I stumble with the Primavera own sample scheduling the "City Center Office Building"How could it be that thte predecessor of Activity EC1090 is also EC1090 (below window) predecessor. Tha...

Jun 23, 2021

Project performance metrices for a portfolio of projects

Forum Topic

Dear all, I am just wondering whether there are any accepted metrics for tracking a schedule-related performance of a group of projects, rather than an individual project. E.g. for example for an individual project there is a Schedule Performance Ind...

Jun 24, 2021

"Book" ABOUT the role of Planning in the UK E&C Industry

Forum Topic

Having recently retired from the industry after 50 years service I put together a "book" on the ROLE of planning within the UK Engineering & Construction Industry. I thought one or two other people might want to enjoy and pass comment so if you want ...

Feb 26, 2022

Formwork Rent Simulation

Forum Topic

Hello,I am trying to model the following scenario, but with little luck. Maybe Rafael or Vladimir cand help me a bit.Scenario:01. Formwork for columns is rented, 1 set (column) = 1000 currency/30 days, 1 set = 25 currency/day.02. Formwork for columns...

Feb 26, 2022