Search

Why are my costs changing to zero?

Forum Topic

Guys, I'm a new Primavera user and whilst I've not had too many problems with most of the functions of it, there is one issue I can't fix and would be grateful if anyone could advise. We have an existing project of around 1000 activities, for each ac...

Sep 25, 2011

Planned Percent Complete on WBS Summary Bars

Forum Topic

Hi, I am trying to find a way to display planned percent complete on WBS summary bars but cannot get it so show. The 'Percent Complete' is being calculated and shown and although all the tasks within my programme are showing their individual 'Planned...

Sep 26, 2011

Formulas using data from different tables

Forum Topic

At the links table I want to transfer the Preceding Activity Finish Date from activity table to a user defined field on links table, same goes for Succeding Activity Start Date. Is there a way to do this?Best regards,Rafael

Sep 26, 2011

Activity table % VS wbs chart % complete - schedule and performance

Forum Topic

Hi Guysmy % complete schedule and performance in my activity table varies from my % complete schedule and performancein my wbs chart view if i add the two mentioned %'s in die chart blocks why is this ? its using the same project and data ? im missin...

Sep 26, 2011

Resource Dependent VS Task Dependent

Forum Topic

Hello Guys, Can any body please tell the difference between Resource Deependent & Task Dependent for an activity and how & where it affects the Schedule (i.e., at Original duration & at resource levelling)?

Sep 27, 2011

Issue with Original Duration in P6 when importing MS Project xlm file

Forum Topic

Hi All, I have a schedule prepared in MSP and I import it to P6 as an xml file. Durations of the tasks in the imported file appears in Original Duration column (as expected). However, when I change the duration of a task in the Original Duration in P...

Sep 27, 2011

Issue with Original Duration in P6 when importing MS Project xlm file

Forum Topic

Hi All, I have a schedule prepared in MSP and I import it to P6 as an xml file. Durations of the tasks in the imported file appears in Original Duration column (as expected). However, when I change the duration of a task in the Original Duration in P...

Sep 27, 2011

Design Outputs

Forum Topic

Does anybody know where I can lay my hands on reliable output reates for the production of design drawings by CAD Operators, ie, how long does it take a CAD Operator to produce a Satge D architectural drawing? Any pointers gratefully received.  Andy

Sep 27, 2011

resource leveling0

Forum Topic

Hi guys deleted, figured out how to level with p6  

Sep 27, 2011

Time Saving Tips in Primavera P6

Forum Topic

Hi Guys,Here are six time saving tips in Primavera P6 Professional R8.1 http://bit.ly/pxO4fM If you know of some good tips, let me know and I can add them. Emily

Sep 27, 2011

Unable to open the P6 programs

Forum Topic

HiIs there any solution for the below problem which pop's up on opening any program  Database Server Error: Could not allocate space for object 'dbo.DLTACTV'.'ndx_dltactv_usession' in database 'pmdb$primavera' because the 'PRIMARY' filegroup is full....

Sep 28, 2011

Lost PRX. file

Forum Topic

Hie, can anyone help me on this ?I am not a planner but i know abit about P3.I found a program file in my planner computer. However, there no prx. file here.There is only 24 sub-files of the program.How can i open this program or how to create a prx ...

Sep 28, 2011

Asta Project Viewer

Forum Topic

Hi, I've received a copy of a Powerproject schedule and have been trying to locate a download of the Asta Project Viewer, but every link I find cannot locate the download on the Asta website. Have Asta withdrawn this software? If so, is there any way...

Sep 28, 2011

Planning Engineer, PMP,PMI-SP ( Dubai & Abu Dhabi)

Forum Topic

Hello my friends,   I would like to thank everyone here, PP is always best place to find solution to your planning and scheduling difficulties.   I am Planning engineer have more than 6 years of experience, I have developed my self in planning and ti...

Sep 28, 2011

Critical Path in MS Project 2007

Forum Topic

Hi Does anyone know how to display the critical path as a default setting Other software i have used shows the CP as a default I have used the Chart Wizard to display the CP but was wondering if there was a better way Any ideas welcome Thanks Regards...

Sep 28, 2011