Resource Limits

Forum Topic

[[wysiwyg_imageupload:943:]]To my Friends Can anyone please tell me whats going on with the attched picture. How do i adjust the black limit line?      

Mar 2, 2012

Schedule transition in different stage

Forum Topic

Hi all Planners,In my company, we have regular process of scheduling.(FEL1/2/3,schedule implementation,facility operation..)It means project team and me need to initial schedule at the early schedule before we issue PO to vendor or subcontractor.So, ...

Mar 2, 2012

What does the following mean when doing schedule analysis

Forum Topic

What does it mean when you run a Varance Report (comparing end dates between the baseline schedule against the current schedule) and you have negative variance for some activities and also TF = 0 for those same activities? These activities have slipp...

Mar 2, 2012

Cost Loading/Resource Spreadsheet

Forum Topic

guys, need some help here...I have my resource/cost loaded schedule. Cost is assigned by providing it in the Budgeted Cost for each activities. However, when I'm viewing the resource usage spreadsheet on weekly timescale, the weekly cost for each act...

Mar 2, 2012

Logic

Forum Topic

Before F9 you can turn on Logic override   What is happening when this is turned on.  How can I fix the issues that this creates

Mar 2, 2012

PDF format problem

Forum Topic

Hi, I need to produce my schedule in PDF format but the start and finish columns are showing part of the time after the date on my printout (i only require the date and not the start / finish time) I have used the column sliders to just show the date...

Mar 3, 2012

Estimating Expected Finish Dates

Forum Topic

Dear PP Members,In planning and scheduling practice, I would like to ask who is making the decision or estimation for expected finish dates?Can a planning engineer decide or construction manager ?Thanks in advance

Mar 3, 2012

AS BUILT PROGRAM

Forum Topic

Hi, I need advice from experts. PROBLEM: Get an Approval of As Built Program SITUATION: Theres an Approved Program, however, the Client requested for As Built Program. My Managers gave the duration for each activity. The Client are not happy and cont...

Mar 4, 2012

testing with the schedule

Forum Topic

Hi everyone:I am new in the schedule world.  I would like to know if i can make a test with a subcontractor schedule and re-organize the activities and productions as i think that its gonna be the really subcontactor´s performance taking in considera...

Mar 4, 2012

Resources

Forum Topic

According to our contract with our client, We should not exceed 200 (men) resources at any given time. However when i extract information from Primavera to do my resource Histogram I get more than 200 (men) resources. If i get more than 200 (men) res...

Mar 5, 2012

Wembley Stadium Failure

Forum Topic

Hi All, Just a quick query - can anyone point to some literature or journals which discuss the nature of the project management of the Wembley National Stadium development?Regards,DC

Mar 5, 2012

Power Generation - Civil Construction of a Steam Turbine Table

Forum Topic

I recently told that there is a International Construction Norm for the Civil Construction of a Steam Turbine Table but I find that almost impossble to believe since the designs and constructability vary based on the size of the proposed Stator Unit....

Mar 5, 2012

P6 R8.2 EPPM Web Client - cannot Schedule or Summarize Project Data

Forum Topic

We have an installation of P6 R8.2 EPPM (for Web client) server on Microsoft Server 2008 with WebLogic 11g.  The Database installed is MS SQL Express 2005.  Java JDK 6 update 27 was selected during P6 setup.P6 installed and configured without errors ...

Mar 5, 2012

P6 R8.2 EPPM Web Client - cannot Schedule or Summarize Project Data

Forum Topic

We have an installation of P6 R8.2 EPPM (for Web client) server on Microsoft Server 2008 with WebLogic 11g.  The Database installed is MS SQL Express 2005.  Java JDK 6 update 27 was selected during P6 setup.P6 installed and configured without errors ...

Mar 5, 2012

Assigning a Material Resource in P6

Forum Topic

Hello All Planners.Please have a look at following example;I added a Material Resource Named "Crushed Aggregates" in my schedule.I have changed resource type to "Material" and adjusted the price per unit.No the unit of measure that i want to keep is ...

Mar 6, 2012

Updating in progress activities in Primavera Contractor.

Forum Topic

Updating in progress activities in Primavera Contractor.   is there an easy way to update in progress activities without having to trial and error a % complete. I just want to progress the works as planned.   I know there is the update progress optio...

Mar 6, 2012

Meeting calendar is causing negative total float

Forum Topic

I have milestones within my programmes which represent capital approvals meetings. These meetings are monthly so I have created a calendar for these milestones with only 1 working day per month. If the activities preceeding these milestones are late,...

Mar 6, 2012