Total Float Project Vs Total float activities
Forum TopicHi,I have a question, In my program the total float for total project is -587 days, but in my activities the maximum that I have is -125, I recently change from P6 V. 8.2 to 8.4. Regards
Hi,I have a question, In my program the total float for total project is -587 days, but in my activities the maximum that I have is -125, I recently change from P6 V. 8.2 to 8.4. Regards
Hello Gents/Ladies, When you are on Contractor side when can you allowed to change the planned %. As on a Contractor side you would issue a planning package which comes with a S curve which says that that at this week you would complete this much % o...
I am working on a tender and currently looking for standard industry norms / production rates in WA / Perth. The key rates i need is for Bulk Excavation, Diaphragm wall constuction, Form work, Concrete etc. Appreciate any feedback. Thanks
Dear all,While converting P3 file to P6, a problem is faced that Manhours assigned to activities as Labour unit in P3 formate becomes Non labour units after convertion to P6, which crearts problem in calculation of Project Progress/Level-1 Summary as...
Dears,First of all, I know my question is not logical but we have no choice and should do as well.In order to update plan in the data date, we should report to different shareholder with difference point of view and concerns.So far we provide several...
For some reason, the option to Add Bar and Add Bar Below is greyed-out and not available to me! Can anyone tell me what I've done and how to correct it? thanks
When I click My posts I always end up at /myuserpoints link instead of /myposts, just take a look at the current address and you will see reference to /myuserpoints instead of /myposts. I believe both links shall be available.I wonder how many do kn...
Hi,I have this situation:Duration activities are 1 hour in level activities to share (corect) resources[[wysiwyg_imageupload:2530:]] Duration activities are 30 min ; in level activities to share resources ; incorect results.[[wysiwyg_imageupload:25...
Hi I was wondering if it was possible to insert a page break before converting to PDF.Currently my schedule runs over 4 A3 pages but the pages are split in the middle of the WBS.in one case the Heading of one WBS is at the bottom of the page with the...
I am currenly pursuing a leading role in L&T in Integrated Project Planning of around 100-300 million $ EPC projects in India. How good would be a opportunity to pursue the same role in Al Baraka Oman. Is the company good? Learning is good?Or a jump ...
JyM engineering presents the WBS matrix, to create a Work Breakdown Structure with the 3D WBS method.http://jym-engineering.blogspot.fr/p/the-wbs-matrix.html
For the longest time, Primavera P6 Professional has been shipping with a defect in one of the sample layouts. The configuration of the Remaining Level of Effort bar in the Classic Schedule Layout is incorrect. The result of this is the bar failing to...
Hello, I have created an application that takes P6 schedules as an input using an xml parser, only to realise that the xml export from P6 does not contain all of the fields that are available in the xer export. Is there a way to export all fields in ...
Hi,I have a production schedule for a project on a customers site. Our engineers work to my schedule and report back progress on a daily basis. The schedule has a baseline set and I update this schedule daily and produce a report which should highlig...
Did you know that the alternative use of the letters DNA is the National Dyslexic Association?
Here's a step by step guide on how to filter projects in Primavera P6 http://ow.ly/QpZFo
Dear All,I am preparing a EOT claim schedule(only time analysis, no prolongation cost). I am using the method Impacted As planned in order to identify the entitlement. The phases of work is as follows;1. Submission of concept design: 30 days2. Approv...
Here we take a look at this peculiar Start to Finish relationship type and share some thoughts on whether to use it or not http://ow.ly/QwcJv
My appology if this one has been discussed before.I am in the middle of discussion with my clkient about our entitelment for an extension of time. Our client asked us to send our price for extera work that was needed for an equipment installation wor...
Hi All,I need to export all the External Relationships (Predecessors and Successors) in my schedule to Excel so that I can re-import them with some changes.When I run the export, with all projects open, I only get the internal relationships.I can get...