For the longest time, Primavera P6 Professional has been shipping with a defect in one of the sample layouts. The configuration of the Remaining Level of Effort bar in the Classic Schedule Layout is incorrect. The result of this is the bar failing to appear when the user creates a Level of Effort activity. Here's how to fix it http://ow.ly/QkD5H