question about contract analysis ?
Forum TopicDear planners i need summary for contract anaylsis, like what is contract anaylsis what is the big points that i must looking for it when i analysis a contractplease advise
Dear planners i need summary for contract anaylsis, like what is contract anaylsis what is the big points that i must looking for it when i analysis a contractplease advise
Similar to the last post but i need a step by step guide in the following scenario. I have inherited a project with an Asta easy plan programme ( I don't usually use Asta) The project is delayed and I want to show the Planned as a baseline that doe...
I have a cost loaded baseline schedule that was originally received from the subconstractor is showing a Budgeted Total Cost of $23,835,030. I have received their latest update and the Budgeted Total Cost is $24,613,252. I have assigned the baseline ...
I have a resource eg rigger working 8 hrs a day(9am to 5pm) for Rs.300/day as standard. I gove him an overtime rate of Rs.90 per hour. Lets say i have an activity which is planned for one day having this rigger as a resource, the planned cost of the...
Hi Gentlemen,I hope Everyone is fine there,I need to ask that How to put the overtime for a resource in Primavera P6.I have Searched and In Resource window I have found an Option of Currency & Overtime in details Tab.But I have No concept that How to...
Hi Gentlemen,I hope Everyone is fine there,I need to ask that How to put the overtime for a resource in Primavera P6.I have Searched and In Resource window I have found an Option of Currency & Overtime in details Tab.But I have No concept that How to...
Hello everyone,Has any of you come across the need to schedule the development of a concept design for a mayor infraestructure project?If so, I would appreciate your comments regarding the approach and/or methodology used.Regards, Nelson
dear planneri faced problem when i make schedule when i choose progress override in p3 i get result, but when i convert the schedule to p6.7 and make schedule with choose progress override i get different result, i don't know why the result different...
Dear Experts...Summary task % Complete =((Sum of Completed duration of the Baseline Activities Duration)/(Sum of Baseline Activities Duration))*100.I want to Calcualte the Sumaary task % Complete Based on the Baseline Duration, not based on the Actua...
Hi, has anybody faced with the incorrect lag changes in claim digger report when you compare 2 schedules. For example, even the lag is not changed in both schedules, claim digger report is shown as it is changed. And it makes it in lots of activities...
Dear All, I want to change a data form user defined field to activity code. I am not able to group resources in the resource assignment layout wrt equipment no,since i have assigned it in the user defined field. so now i have to change all the equi...
Hello everybody,My issue is I'm having a plan for a 51 residental buildings project, in a stage of construction there will be a lot of similar activities, so I create the activities in one building then I copy them to the other buildings , now I want...
On my milestones, my P6 progress line completely ignores progress on the milestones (0% or 100%) (ahead or behind) . Progress reporting on the Bars is fine, and the progress line is a good "zig-zag" drop-line. Is there a way of having the progress of...
So here are the answers to the quiz, along with an explanation of how to compute critical path drag in a simple (all FS) network:Which activity or activities has/have the most total float, and how much? J has TF = 40Which activity or activities has/h...
Can anybody tell me how to use claim digger in P6. I am having the Icon in P6 window,but when i click it nothing is coming. Kindly help.
Hi everyone, I am using Primavera PM6 to manage the coming workload of our team. We have about 95 projects in progress with 4 to 9 activities in each project. My problem occurs when I open many projects at the same time, the remaining units of some t...
Im just delving into TILOS for the first time as a new planner. I emailed Tilos support for any reference materials or possibly any trainers in the vecinity of Salt Lake City Utah, but have not recieved any response.Im really intersted in getting th...
I am having huge problems trying to export a project created in MS Project (by my owner) into Primavera's P4 Contractor.I need help so that I don't have to recreate the entire project from scratch. Anyone know a way or a file conversion utility to ac...
Please help!
This may be a basic question, but I want to design a plan that works back from a given delivery date. I've discovered I can enter predecessors with a minus number of days, but it doesn't appear to work the dates back consistently. Ideas?