Search

Single line being printed on new page

Forum Topic

Hi, Another problem that has left me scratching my head!! I have a schedule in MSP2003 that I want to fit onto two pages, but when I print it and set the page layout to print on 1 page wide x 2 high, it puts the final line onto a third page. If I try...

Dec 6, 2011

Deactivating a relationship

Forum Topic

Dear All, Is it possible to deactivate temporarily a relationship in Primavera P6 ? let explain : I have 3 projects P1, P2 and P3. The activities of P1 and P2 are the predecessors of P3. I'd like to know the impact of P1 alone to compare it with the ...

Dec 7, 2011

Primavera timesheet alterations

Forum Topic

Hi In Primavera PM 6.7 with Progress Reporter is it possible to edit or unapprove a submitted and approved timesheet? The timewriter can edit them up until they're submitted (and optionally rejected) The time approver can edit the timewriters timeshe...

Dec 7, 2011

Overall BQ progress % claim and Programme progess% does not match

Forum Topic

Hello everyone, I am working in civil projects and my Project Manager is always telling me that "Why  Overall  Programme Progress % and BQ % progress(calculated by QS) does not match. Anyone advise or solution to this scenario to link the BQ claim an...

Dec 8, 2011

FINISH TO FINISH RELATION

Forum Topic

Friends Please help me to utilize the finish finish relation.. Excavation is SS with Dewatering the same day...Dewatering is FF with Back filling Manhole Installation Back filling  I have make relations  for Dewatering Dewatering SS Excavation is pre...

Dec 8, 2011

Constraint on time?

Forum Topic

Hey everyone i have been  searching for this and think the answer is no but just wanted to clarify..Is there anyway to set a constraint on hours spent on an activity or do constraints only apply to dates?Sorry if its a stupid question im quite new to...

Dec 8, 2011

Strange WBS when importing a MS Project schedule

Forum Topic

Hello fellow planners,I recently tried to import a 400 activity schedule from MS Project 2003 into Primavera PM6, via either a MPP or XML file.Almost everything went right, except the WBS which looks really strange: only the project level and the 1st...

Dec 8, 2011

original duration set to 0 when changing resource...

Forum Topic

hi everyone ! a colleague of mine, working with P6 v6.2.1 had a strange problem :he had, on every task of his project, an original duration and a resource (labor).budgeted units calculated just fine, but when he went to replace the resource with anot...

Dec 8, 2011

changing duration activities type

Forum Topic

Dear gys,I have a problem in P3 version:I have a project that its activity duration type is hour, can I change the type to day and also I don't want to break the decimal part of duration beacause the date will change. how can change it?Can I change t...

Jan 18, 2012

Database Configuration Error

Forum Topic

Hi....I have a standalone P6 installation (Windows-XP) and it was running ok until this morning. Our IT person did something today with it and now I am getting the "configure database message" when i type in my user name and pw which was admin/admin....

Jan 19, 2012

Database Configuration Error

Forum Topic

Hi....I have a standalone P6 installation (Windows-XP) and it was running ok until this morning. Our IT person did something today with it and now I am getting the "configure database message" when i type in my user name and pw which was admin/admin....

Jan 19, 2012

% completed for Level f Effort activities

Forum Topic

Hi AllI'm using Level of Effort activities in P6 and want to know the settings for the automatic update of the % completed of the LoE. It does not work in my schedule. Could everyone give me a hint how to solve my problem??? Thanks Frank

Jan 19, 2012

EPC & DB Contracts

Forum Topic

What benefits the Owner can gain by awarding EPC or Design & Build Contract to a Contractor. For eg: a. The Owner defines the Scope of work, Specification, Lumpsum Budget, Quality, Duration, Basic design etc. b. The Contractor has to develop the deta...

Jan 19, 2012