Project End dates Changes when Importing

D
Dieter Wambach 👤 Member for 19 years 6 months

Amreshwar



Did you check the hours per day settings in the Admin preferences?



BTW if you have a maintenance contract it’s better to upgrade. Some bugs of version P6.0 (pre Oracle) became solved in P6.1.



Regards

Dieter

A
Amreshwar Shukla 👤 Member for 23 years 2 months

Dear Muhammad,

Thanks for the reply,

I have change the import configuration to the ’update existing" but no difference.



I think this may be due to some other setting , which I am not able to figure out this moment!!! May be due to different versions??????



Can any body help on this issue>>



Thanks.

M
muhammad anwar 👤 Member for 19 years 5 months

Amreshwar,





The default setting in the import configuration option is keeping the existing calendars. It means if you have calendar with the same name as you are importing with XER then import will keep the existing calendar. what you need to do is to change the import configuration option for calendars to ’update existing’



Hope this will solve the problem.



regards



Muhammad

Featured Partner

Top Posters

Jeamiell Ostrovsky
2 posts
Hamzah Ahmed
0 posts
Quinton van Eeden
3 posts
Sunchana Johnston
12 posts
Akram Hammam Mohamed
17 posts
Sagar Raut
14 posts
Patricio_aoa
0 posts
James Williams
75 posts
Philip Assou-Dodji
1 posts
jeoffrey reyes
15 posts