Thanks a lot for your help. I tried all options and got a lot of new points there, but I couldnt find axact descriptions you told (remainning early units)!
Open Reports and make a new report and choose time distrbuted data then activity resource assignments and then filter your required resources and when it comes to the time interval fields choose remainning early units & remaining late units , run report with the following options : ascii filed delimiter :tab text qualifier: none and choose the file name with xls extension and enjoy
Spider Project is most functional and powerful professional project management software.
The first SP version was launched in 1993 and since then it has been constantly improved. Today is used in 34 countries though most Spider Project customers are in Russia. Spider Project offers numerous unique functional features and is the only PM software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios.
The unique features of Spider Project include Quantity Based Scheduling, Conditional Scheduling, Skill Scheduling, Optimal Resource, Cost and Material Leveling, Resource Critical Path Calculation, Cash and Material Flows Calculation and Management, Trend Analysis, Advanced Risk Simulation and Analysis, Calculation of Success Probability Trends, Calculation and Management of required Project Time and Cost Buffers, Application of Corporate Norms, Management of many Parallel Budgets, Multiple WBS and many others.
Spider Project was and is used for management of many large scale programs in Russia, including $51bln construction program for 2014 Winter Olympic Games preparation.
The application areas where Spider Project is successfully used include Aerospace, Banking, Construction, Defense, Energy, Engineering, Infrastructure, Manufacturing, Metallurgy, Mining, Oil & Gas, Railways, Retail, Shipbuilding, Software Development, Telecommunications, Utilities, etc.
P6-Auditor - Display information from Primavera P6 audit tables in a user-friendly format
Unifier-Archiver - Extract and archive important documents and attachments from Primavera Unifier
Unifier-Loader - Load data into and out of Unifier via Excel
PCM-Loader - Import data into Primavera Contract Management with flexible and secure, template-driven Excel spreadsheets
PCM-Archiver - Extract and archive important documents and attachments from Primavera Contract Management
PCM-Unifier Migrator - Automatically transfer live and historical data from Primavera Contract Management to Primavera Unifier with ease
Create Radically Better Construction Schedules with ALICE Technologies
Use the power of AI to create construction schedules that reduce risk while cutting costs and build time. With ALICE, develop the ideal schedule during preconstruction -- or recover projects that are off schedule and over budget.
Weighted steps in primavera plan P6
Hello
Does any body know how weighted steps can affect my plan?
Lets assume one activity has 4 steps, every step has its own start, finish and weight.
I would like to schedule the plan and draw plan Scurve, but the weights and dates in steps does not affect my %schedule.
Any help appreciated.
Sahar
Hi Johar,
U can try Pervasive ODBC drivers as well.
I have never used P5, but works brilliantly on P3.1
You dont need to perform these things with every update.
If u use pervasive ODBC drivers (Free download available on net) then u need to just press the REFRESH button and it will be updated.
Its far easy comapred to these things.
Paper for the same can be found at Paul Harris (www.eh.com.au) website
Cheers,
Ravi
OK,
Thanks a lot. you had told every thing. solved.
Hi Mouneer,
Thanks a lot for your help. I tried all options and got a lot of new points there, but I couldnt find axact descriptions you told (remainning early units)!
Could you please help me to find out this figure.
Please have my e-mail as below: [email protected]
Hi there
Open Reports and make a new report and choose time distrbuted data then activity resource assignments and then filter your required resources and when it comes to the time interval fields choose remainning early units & remaining late units , run report with the following options : ascii filed delimiter :tab text qualifier: none and choose the file name with xls extension and enjoy
I hope that helps you
Mouneer Adel