Project Planner

Project Planner, Wates Construction, Major Construction Projects

START Date

I am a project planner for a top 10 UK contractor working in the construction division. I manage several projects when they reach site as well as undering tenders and then managing the process through design and pre construction into the construction phase.

Project Planner, Downer, Airport Runway, Bridges, Irrigation Systems., Roading, Stormwater, Various Civil Infrastructures: Building Construction, Wastewater, Watermain

START Date
Experience Hours (Planning & Scheduling)
3500
Experience Hours (Cost Management)
1500
Experience Hours (Forensic Analysis)
1500

Project Planning, Scheduling, Monitoring & Controlling, Progress Reporting, Performance Measurement, Cost Forecasting.

Project Planner , Fabricom Contracting Ltd, Boston Massachusetts Utilities - Distrigas LNG distribution module

START Date
END Date
  • Develop from the contractual programme a working level 4 programme for the civil, equipment installation, cable installation and pre-commissioning work (Static Var Compensators, Harmonic Filters, Unisafe 22kV Switchgear) at 7 bulk load sites around the LUL rail network.
  • Liaise with ABB Sweden, Alfreton, and Ellesmere Port on the delivery and Factory Acceptance Test dates.
  • Weekly site visits to review and collaborate progress and attend site vendor meetings.
  • Produce progress reports to the client as per period payment profiles.
  • At completion of installati

Project Planner , London Underground Limited, Northern Line Upgrade Project

START Date
END Date

Project Planner on a Private Finance Project to install Power Quality Equipment to the value of £65 Million for London Underground Limited (LUL) as part of a variance to the Northern Line Upgrade project.

Project Planner, Fabricom Contracting Ltd, ICHP Auxiliary Boiler Installation

START Date
END Date

ICHP Auxiliary Boiler Installation with associated ductwork, steelwork and pipe work.

  •  Develop installation programme for ductwork, steelwork access and pipe work for two Auxiliary Boilers for client Foster Wheeler.
  • Project Engineer pipe work erection packs, pipe support requirements and progress tracking documentation.

Saturate Gas Plant £8 million rebuild, managed by Fluor Limited for Conoco Limited’s Humber Oil Refinery.